Laserfiche WebLink
STATION 320 <br />EC -field <br />Flow Rate (cfs) Temp © pH — field (s.u.) (umhos /cm) <br />Date <br />10 -07 -09 <br />NO FLOW <br />10 -13 -09 <br />NO FLOW <br />10 -19 -09 <br />NO FLOW <br />03 -08 -10 <br />NO FLOW <br />03 -24 -10 <br />NO FLOW <br />04 -13 -10 <br />2.0 <br />10 <br />8.0 <br />550 <br />04 -21 -10 <br />1.5 <br />17 <br />8.0 <br />450 <br />05 -05 -10 <br />2.0 <br />18 <br />8.0 <br />400 <br />05 -17 -10 <br />2.0 <br />12 <br />8.0 <br />450 <br />06 -08 -10 <br />2.0 <br />- <br />- <br />- <br />06 -20 -10 <br />2.0 <br />13 <br />8.1 <br />500 <br />07 -08 -10 <br />1.0 <br />20 <br />8.1 <br />500 <br />07 -21 -10 <br /><0.25 <br />- <br />- <br />- <br />08 -10 -10 <br />1.0 <br />- <br />- <br />- <br />08 -25 -10 <br />1.5 <br />19 <br />8.0 <br />300 <br />09 -14 -10 <br />NO FLOW <br />09 -22 -10 <br />NO FLOW <br />Kerr (Marr) Mine - 2010 Annual Hydrology Report <br />5.1 LOADOUT AREA SURFACE MAINTENANCE <br />Maintenance performed at the Loadout during 2010 consisted of the cleaning of the discharge ditch <br />from the primary outlet pipe discharge to the measuring flume in the ditch. The ditch was cleaned with <br />a backhoe of sod & grasses that were overgrowing the ditch. <br />6.0 WELL INSPECTION <br />The wells associated with the Kerr Loadout Monitoring requirements were inspected for defects and /or <br />repair needs. No anomalous conditions were observed during the April 21, 2010 inspection. Alluvial <br />wells AP -1 and AP -2, located at the Loadout, will continue to be monitored until final bond release is <br />achieved for that site. <br />5 <br />