Laserfiche WebLink
1.000 <br />(GEN.) <br />1.000 <br />(AVG.) <br />0.830 <br />(1 SHIFT /DAY) <br />0.800 <br />(FND <br />1.000 <br />(CAT HB) <br />1.000 <br />(CAT HB) <br />1.438 <br />(CAT HB) <br />1.000 <br />(PAT) <br />Bulldozer Worksheet Cont'd <br />Dozing method: <br />Visibility: <br />Job efficiency: <br />Spoil pile: <br />Push gradient: <br />Altitude: <br />Material Weight: <br />Blade type: <br />Total job time: <br />Total job cost: <br />Net correction: 0.8593 <br />Adjusted unit production: 1,398.08 LCY /hr <br />Adjusted fleet production: 1398.08 LCY /hr <br />JOB TIME AND COST <br />Fleet size: <br />Unit cost: <br />1 Dozer(s) <br />$0.114 /LCY <br />69.57 Hours <br />$11,040.85 <br />Task #1006 <br />Page 2 of 2 <br />CIRCES Cost Estimating Software <br />