Laserfiche WebLink
Task description: Distribute topsoil/finish grading <br />Permit Action: June 9, 2011 <br />Inspection <br />Site: Sievers Pit <br />PROJECT IDENTIFICATION <br />Task #: 006 State: Colorado Abbreviation: None <br />Date: 6/14/2011 County: Garfield Filename: M098 -006 <br />User: DMC <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Basic Machine: Cat D8R Series II - 8U (2005) <br />Horsepower: 310 <br />Blade Type: Universal <br />Attachment: NA <br />Shift Basis: lamer day <br />Data Source: (CRG) <br />Cost Breakdown: <br />Ownership Cost/Hour: <br />Operating Cost/Hour: <br />Ripper op. Cost/Hour: <br />Operator Cost/Hour: <br />Total unit Cost/Hour: $158.69 <br />Total Fleet Cost/Hour: $158.69 <br />MATERIAL QUANTITIES <br />Initial Volume: 97,271 <br />Swell factor: 1.000 <br />Loose volume: 97,271 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly production: <br />Materials consistency description: Loose stockpile 1.2 <br />Average push gradient: <br />Average site altitude: <br />Material weight: <br />Weight description: <br />0% <br />6,020 feet <br />1,600 lbs /LCY <br />Top Soil <br />Job Condition Correction Factor <br />Operator Skill: <br />Material consistency: <br />$39.08 <br />$81.13 <br />$0.00 <br />$38.49 <br />50 feet <br />1,627.0 LCY /hr <br />BULLDOZER WORK <br />0.750 <br />1.200 <br />Utilization % <br />NA <br />100 <br />0 <br />NA <br />Source <br />(AVG.) <br />(CAT HB) <br />Page 1 of 2 <br />Permit/Job #: M1977098 <br />CIRCES Cost Estimating Software <br />