Laserfiche WebLink
In the event surface disturbance is required, topsoil will be salvaged according to the following plan: <br />• Identification of area in which topsoil salvage operations are to occur, either through flagging of <br />area or verbal description of area to supervisor. <br />• Determination of depth to which topsoil will be salvaged (topsoil salvage depths have been <br />determined through a report by Jim Walsh that is presented in Exhibit 13, Soil Inventory-Mine <br />Facilities, Disposal Site, and Pit 6 and 7 Areas). <br />• Topsoil is then removed. If possible, topsoil will be directly redistributed over a re-graded area as <br />opposed to long-term stockpiling. <br />J~ <br />All topsoil stockpiles will be stabilized with a perennial seed mixture. The perennial seed mixture is presented in <br /> <br />Permit Renewal No. 4 <br />2.05-19.1 Revised 3/5!03 <br />