Laserfiche WebLink
CIRCES Cost Estimating Software <br />BULLDOZER WORK <br />.._. ____ ...............___. <br />PROJECT IDENTIFICATION <br />Task # : 006 State :Colorado <br />Date : 06/03/2011 County :Mineral <br />User : RCO Site :North Amethyst Project <br />Agency or organization name :DRMS <br />Permit or other job action :Modification MD -3 <br />Task description :Recontour of access road <br />Permit/job# : P -2010 -007 <br />Abbreviation :none <br />Filename :P007-006 <br />HOURLY EQUIPMENT COST <br />Cost Breakdown : <br />MATERIAL QUANTITIES <br />Initial <br />volume : <br />259 <br />HOURLY PRODUCTION <br />CCY <br />Source of estimated volume : road 930 LF x 30 sf, cut and fill replaced <br />Source of estimated swell factor :na <br />Ownership cost/hour : <br />Operating cost/hour : <br />Ripper op. cost/hour : <br />Operator cost/hour : <br />Total unit cost/hour : <br />Average push distance : 50 feet <br />Unadjusted hourly production : 464.3 LCY /hr <br />Material consistency description : <br />Consolidated stockpile <br />Average push gradient : 0.00 % (pos) <br />Average site altitude : 11,600 feet <br />Material weight : 2,900 Ibs /LCY <br />Weight description : <br />Decomposed rock - 50% Rock, 50% Earth <br />JOB TIME AND COST <br />Fleet size : <br />Unit cost : <br />Basic machine : Cat D5G LGP - 5P <br />Blade type :PowerAngle Tilt <br />Attachment no. 1 :ROPS Cab <br />Attachment no. 2 :3-shank ripper <br />1 Dozer(s) <br />$0.524 /LCY <br />Swell <br />factor : <br />$17.95 <br />$24.13 <br />$0.00 <br />$38.54 <br />$80.62 <br />Utilization % <br />NA <br />100 <br />0 <br />NA <br />Job Condition Correction Factors <br />Operator skill : <br />Material consistency : <br />Dozing method : <br />Visibility : <br />Job efficiency : <br />Spoil pile : <br />Push gradient : <br />Altitude : <br />Material weight : <br />Blade type : <br />Net correction : <br />Total job time : <br />Total job cost : $158 <br />Horsepower : 90 <br />Shift basis : 1 per day <br />Data source : (CRG) <br />Total fleet cost/hour : $80.62 <br />Loose <br />1.165 volume : 302 LCY <br />0.75 <br />1.00 <br />1.00 <br />1.00 <br />0.83 <br />0.70 <br />1.00 <br />0.96 <br />0.79 <br />1.00 <br />0.33 <br />1.96 Hours <br />Source <br />(avg.) <br />(Cat HB) <br />(gen.) <br />(avg.) <br />(1 shift/day) <br />(fnd -mf) <br />(Cat HB) <br />(Cat HB) <br />(Cat HB) <br />(PAT) <br />Adjusted unit production : 153.99 LCY /hr <br />Adjusted fleet production : 153.99 LCY /hr <br />