My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-06-15_REVISION - P2010015
DRMS
>
Day Forward
>
Revision
>
Prospect
>
P2010015
>
2011-06-15_REVISION - P2010015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 11:37:38 AM
Creation date
6/24/2011 12:52:26 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
P2010015
IBM Index Class Name
REVISION
Doc Date
6/15/2011
Doc Name
Approval letter for MD-01
From
DRMS
To
Rio Grande Silver, Inc.
Type & Sequence
MD1
Email Name
RCO
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROJECT IDENTIFICATION <br />Task # : 005 State :Colorado Permit/job # : P -2010 -007 <br />Date : 06/03/2011 County :Mineral Abbreviation :none <br />User : RCO Site :North Amethyst Project Filename : P007 -005 <br />Agency or organization name :DRMS <br />Permit or other job action :Modification MD -3 <br />Cost Breakdown : <br />MATERIAL QUANTITIES <br />Initial <br />volume : <br />Task description :Pull material onto access road for recontouring <br />HOURLY EQUIPMENT COST <br />302 <br />Source of estimated swell factor :na <br />HOURLY PRODUCTION <br />Ownership cost/hour : <br />Operating cost/hour : <br />Operator cost/hour : <br />Total unit cost/hour : <br />LCY <br />Job Condition Correction Factors <br />Site altitude : 11,600 feet <br />JOB TIME AND COST <br />Fleet size : <br />Unit cost : <br />$0.484 <br />CIRCES Cost Estimating Software <br />HYDRAULIC EXCAVATOR WORK <br />Machine description :Cat 320C <br />$26.97 <br />$32.00 <br />$38.72 <br />$97.69 <br />Utilization % <br />NA <br />100 <br />NA <br />Swell <br />factor : NA <br />Source of estimated volume :930 LF road x 30 sfX -sect. <br />Excavator Cycle Time (load bucket, swing loaded, dump bucket, swing empty) <br />Basic job condition description : AVERAGE <br />Secondary job condition within basic description : AVERAGE <br />Cycle time value : 0.28 minutes <br />Bucket Capacity <br />Rated bucket capacity : 1.63 LCY (heaped) Bucket size class : medium <br />Bucket fill factor : 0.85 Hard, tough clay (80% - 90 %) <br />Adjusted bucket capacity : 1.39 LCY <br />Unadjusted hourly unit production : <br />Adjusted hourly unit production : <br />Adjusted hourly fleet production <br />1 excavator(s) <br />per LCY <br />Altitude adjustment : <br />Job efficiency adjustment : <br />Net job correction : <br />292.71 <br />201.65 <br />201.65 <br />LCY /hour <br />LCY /hour <br />LCY /hour <br />Total job time : <br />Total job cost : $146 <br />Horsepower : 138 <br />Weight (MT) : 19.70 <br />Shift basis : 1 per day <br />Data source : (CRG) <br />Total fleet cost/hour : $97.69 <br />Loose <br />volume : 302 LCY <br />0.83 <br />0.83 <br />0.69 <br />1.50 hours <br />Source <br />(Cat HB) <br />(1 shift/day) <br />multiplier <br />
The URL can be used to link to this page
Your browser does not support the video tag.