Laserfiche WebLink
ROADABLE EQUIPMENT <br />Machine <br />Description <br />-Water Tanker, 2,500 Gal. <br />- Pipe /pump truck <br />$84.12 <br />$145.00 <br />1 <br />1 <br />Subtotals : <br />$84.12 <br />$145.00 <br />$229.12 <br />EQUIPMENT HAUL DISTANCE and TIME <br />Transportation Cycle Time : Non - <br />Roadable <br />Equipment <br />1.12 <br />Haul time (hours) = <br />Return time (hours) = <br />Loading time (hours) = <br />Unloading time (hours) = <br />Subtotals = <br />JOB TIME AND COST <br />1.12 <br />0.50 <br />0.50 <br />3.25 <br />Total <br />Cost/hour /unit <br />Fleet Size Haul Trip <br />(No. units) Cost/hr /fleet <br />Nearest major city or town within project area region : <br />Total one -way travel distance : <br />Average travel speed : <br />Roadable <br />Equipment <br />1.12 <br />1.12 <br />NA <br />NA <br />2.25 <br />Total non - roadable mob /demob cost " : <br />* two round trips with haul rig <br />Total roadable mob /demob cost "" : <br />** one round trip, no haul rig <br />Total job time : <br />Return Trip <br />Cost/hr /fleet <br />$84.12 <br />$145.00 <br />$229.12 <br />Del Norte <br />45.0 <br />40.0 <br />$1,925.51 <br />$515.53 <br />6.50 <br />Total job cost : $2,441 <br />sheet 2 of 2 <br />miles <br />mph <br />hours <br />