Laserfiche WebLink
PROJECT IDENTIFICATION <br />Agency or organization name :DRMS <br />Machine <br />Description <br />-Cat D5G LGP - 5P <br />-Cat 320C <br />-Reveg /weed equipmt <br />Task # : 010 <br />Date : 06/03/2011 <br />User : RCO <br />Permit or other job action :Modification Md -1 <br />Task description :Haul reclamation equipment to and from site <br />EQUIPMENT TRANSPORT RIG COST <br />NON - ROADABLE EQUIPMENT <br />Cost Breakdown : <br />CIRCES Cost Estimating Software <br />EQUIPMENT MOBILIZATION / DEMOBILIZATION <br />State :Colorado <br />County :Mineral <br />Site : West Equity Project <br />Permit/job # :P-2010-015 <br />Abbreviation :none <br />Filename :P015-010 <br />Shift basis : 1 per day <br />Cost data source : CRG Data <br />Truck tractor description :Generic on- highway truck tractor, 6x4, diesel powered, 400 HP (2nd half, 2006) <br />Truck trailer description :Generic folding gooseneck, drop deck equipment trailer (25T, 50T, and 100T) <br />Available rig capacities : 0 -25 Tons 26 -50 Tons 51+ Tons <br />$16.63 <br />$44.38 <br />$27.66 <br />$0.00 <br />$88.67 <br />$18.37 <br />$46.13 <br />$27.66 <br />$25.39 <br />$117.55 <br />Weight/unit Ownership <br />(Tons) Cost/hr /unit <br />Ownership cost/hour <br />Operating cost/hour <br />Operator cost/hour <br />Helper cost/hour <br />Total Unit Cost/hour <br />12.17 <br />21.71 <br />10.00 <br />$13.64 <br />$22.58 <br />$10.00 <br />$88.67 <br />$88.67 <br />$88.67 <br />1 <br />1 <br />1 <br />Subtotals : <br />$102.31 <br />$111.25 <br />$98.67 <br />$312.23 <br />$88.67 <br />$88.67 <br />$88.67 <br />$266.01 <br />Haul Rig <br />Cost/hr /unit <br />Fleet Size <br />(No. units) <br />Haul Trip <br />Cost/hr /fleet <br />$22.33 <br />$50.07 <br />$27.66 <br />$25.39 <br />$125.45 <br />Return Trip <br />Cost/hr /fleet <br />sheet 1 of 2 <br />DOT permit <br />Cost/fleet <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.0 <br />