Laserfiche WebLink
7. The Type and Approximate Quantity of Fertilizer, Organic Material or Soil Conditioner Used <br />and Location of Use <br />None <br />8. Estimates of the Location and Number ofAcres to be Affected in the next Report Year <br />The next pit will be advanced to the north of and parallel to the active pit as shown on the 2010 -11 <br />Annual Reclamation Map. Therefore, the potential disturbance for 2011 -12 is not expected to exceed: <br />Active Pit Advance — 2.0 acres <br />Topsoil Removal — 2.0 acres <br />9. The Effective Date of this Information Provided Above Shall be No More than 45 Days Prior <br />to the Anniversary Date <br />For the sake of continuity, the effective date of this information is from June 1, 2010 to June 1, 2011. <br />2 <br />