My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-06-21_APPLICATION CORRESPONDENCE - C2010088
DRMS
>
Day Forward
>
Application Correspondence
>
Coal
>
C2010088
>
2011-06-21_APPLICATION CORRESPONDENCE - C2010088
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:34:43 PM
Creation date
6/22/2011 9:31:52 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C2010088
IBM Index Class Name
Application Correspondence
Doc Date
6/21/2011
Doc Name
Adequacy Review No. 2
From
DRMS
To
CAM Colordo, LLC
Email Name
MPB
SB1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Corey Heaps <br />CAM Colorado LLC <br />June 21, 2011 Page 56 <br />116a. 2.10.3(1)(b) makes the statement that the land within the permit boundary is owned <br />by the Applicant. With the addition of the Construction Material Borrow Area on <br />property owned by Tavistock Partners, LLC, and the Haul Road #1 easement on <br />Fruits Development, LLC, this statement appears to be in error. Please revise this <br />paragraph as appropriate. <br />Maps 10, 11, and 12 Pre -and post- mining topogUhy and Cross Sections <br />116b. Please add an additional cross section which passes through the Buried Coke Fines <br />Area and crosses the Access Road, Haul Road #2, Rail Loop, and the Truck Dump, <br />following the alignment of the 96" CMP tunnel. <br />116c. On Map 12 Sections E-E' and F -F', please revise the drawing to accurately portray <br />the proposed dimensions of Haul Road #1, the proposed BMPs, and the limits of the <br />30' easement. <br />116d. Please provide the horizontal and vertical scales for Section G-G' on Map 12. <br />Map 13 Drainage Plan Ponds 1 & 2 <br />116e. Please label ponds 1 and 2 in the Plan view. <br />116L Please provide the contour interval for the plan view, and label the contour lines. <br />1168. The vertical scale on the Sections appears to be 1" = 10' rather than 1" = 5'. Please <br />revise as appropriate. <br />Map 15 Haul Road Plan and Profile <br />116h. On the Typical Section for Haul Road #1, please illustrate the limits of the 30' <br />easement, and provide an accurate depiction of the roadway dimension and <br />proposed BMPs. <br />1161. Please label the contour lines in the plan view on this map. <br />Map 16 Loadout Facilities <br />116j. The volume of the proposed Cover Fill pile is given as 15,00 cubic yards, when <br />15,000 cubic yards is likely intended. Please revise as appropriate. <br />Map 17 Coal Handling Facilities Detail Ma <br />116k. Construction of the Truck Dump and CMP tunnel will appear to require excavation <br />into the Coke Fines Settling Pond and/or Buried Coke Fines shown on Maps 10 and <br />
The URL can be used to link to this page
Your browser does not support the video tag.