My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-06-14_REVISION - C1980007
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1980007
>
2011-06-14_REVISION - C1980007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:34:29 PM
Creation date
6/20/2011 9:02:13 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007
IBM Index Class Name
REVISION
Doc Date
6/14/2011
Doc Name
Letter & Application
From
Mountain Coal Company, LLC
To
DRMS
Type & Sequence
MR376
Email Name
TAK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
.ov•co <br />a .- <br />COLORADO DIVISION OF RECLAMATION, MINING AND SAFETY <br />'? 1313 Sherman Street, Room 215, Denver, Colorado 80203, (303) 866-356.7 <br />APPLICATION FORM FOR A REVISION <br />TO A COAL MINING AND RECLAMATION PERMIT <br />This form must be completed and submitted with all requests for minor revisions, as defined in Rule <br />1.04(73), technical revisions, as defined in Rule 1.04(136), and permit revisions, as defined in Rule <br />1.04(90). All revisions are to address the requirements of Rule 2.08.4. Three (3) copies of the revision, <br />including maps, must be submitted in order for it to be complete. <br />All revisions are to be formatted so they can be inserted into the permit to replace the revised sections, <br />maps, tables and/or figures, with a revised table of contents, if necessary. The revision submittal date <br />should be printed in the lower right corner of each revision page. A cover letter to the revision should <br />explain the nature of the revision and reference the specific permit sections being revised. <br />For federal mines, a copy of the revision application must be submitted to all agencies on the federal <br />mailing list (except OSM) at the same time the application is submitted to the Division, and proof of <br />distribution must be submitted to the Division along with the application. Copies of revision pages modified <br />during the review process must be distributed in the same manner, along with proof of distribution. Proof <br />of distribution must be submitted prior to implementation of the revision. <br />Permit No.: C - 1980 - 007 Date: 06 / 14 / 11 <br />Permittee: Mountain Coal Company LLC <br />West Elk Mine <br />Street: P.O. Box 591 <br />City: Somerset <br />State: CO Zip Code: 81434 - 0591 <br />Brief Description of Revision: Minor Revision No. MR-376: ST-5 Escape Tunnel Fan <br />concrete protection wall <br />Public Notice Attached: Yes _ No X (Required for PRs and TRs) <br />Bond Increase: Yes _ No X Federal X Non-Federal Mine <br />Proposed Change in: <br />Permit Area - Surface Ownership - <br />Disturbed 0 0 Acres Private Land (+ /-1 0 0 Acres <br />Permit (+ /-) _ 0 0 Acres Federal Land (+/-) _ 0 0 Acres <br />Affected (+ /-) _ 0 0 Acres State Land (+ /-) _ 0 0 Acres <br />Mineral Ownership - <br />Mineral Private (+/-) _ 0 0 Acres <br />Mineral Federal (+/-) _ 0 0 Acres <br />Mineral State (+ /-) _ 0 . 0 Acres
The URL can be used to link to this page
Your browser does not support the video tag.