Laserfiche WebLink
C- 2010 -088 Fruita Loadout <br />2' Preliminary Adequacy Review (MLT) <br />25- May -2011 <br />Page 8 of 8 <br />The vertical scale on the Sections appears to be 1" = 10' rather than 1" = 5'. Please revise as <br />appropriate <br />Map 15 Haul Road Plan and Profile <br />• On the Typical Section for Haul Road #l, please illustrate the limits of the 30' easement, and <br />provide an accurate depiction of the roadway dimension and proposed BMPs. <br />• Please label the contour lines in the plan view on this map. <br />Map 16 Loadout Facilities <br />• The volume of the proposed Cover Fill pile is given as 15,00 cubic yards, when 15,000 cubic <br />yards is likely intended. Please revise as appropriate. <br />Map 17 Coal Handling Facilities Detail Map <br />• Construction of the Truck Dump and CMP tunnel will appear to require excavation into the <br />Coke Fines Settling Pond and /or Buried Coke Fines shown on Maps 10 and 11. Please <br />address this subject (excavation in and disposal of coke fines) in the permit text. <br />Map 19 Previously Disturbed Areas <br />Certain areas are cross - hatched on the map, but no cross hatching pattern is identified in the <br />Legend. Please clarify the intent of the cross -hatch pattern. <br />Please let me know if you require additional information. <br />cc: Sandy Brown, DRMS <br />