My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-06-06_PERMIT FILE - P2011011
DRMS
>
Day Forward
>
Permit File
>
Prospect
>
P2011011
>
2011-06-06_PERMIT FILE - P2011011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:34:14 PM
Creation date
6/10/2011 8:51:21 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
P2011011
IBM Index Class Name
Permit File
Doc Date
6/6/2011
Doc Name
Approval to commence prospecting
From
DRMS
To
Rio Grande Silver, Inc.
Email Name
RCO
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROJECT IDENTIFICATION <br />Task #: 006 <br />Date : 0610612011 <br />User : RCO <br />CIRCES Cost Estimating Software <br />BULLDOZER WORK <br />State :Colorado <br />County:Mineral <br />Site :East Upper Rat Creek <br />Agency or organization name: DRMS <br />Permit or other job action :New NOI <br />Task description :Recontourgrading of access road <br />HOURLY EQUIPMENT COST <br />Basic machine : Cat D5G LGP - 5P <br />Blade type : Power Angle Tilt <br />Attachment no. 1 : ROPS Cab <br />Attachment no. 2 :3-shank ripper <br />Horsepower: 90 <br />Shift basis : 1 per day <br />Data source : (CRG) <br /> Utilization % <br />Cost Breakdown : Ownership cost/hour : $17.95 NA <br /> Operating cost/hour : $24.13 100 <br /> Ripper op. cost/hour : $0.00 0 <br /> Operator cost/hour : $38.54 NA <br /> Total unit cost/hour : $80.62 Total fleet cost/hour: - $80.62 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 696 CCY factor : 1.165 volume : 811 LCY <br /> <br />Source of estimated volume :road 2500 LF, 30 sfX-sect cut and fill prism <br />Source of estimated swell factor :na <br /> <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br /> Operator skill : 0.75 (avg.) <br />Average push distance : 50 feet Material consistency : 1.00 (Cat HB) <br />Unadjusted hourly production : 464.3 LCY/hr Dozing method : 1.00 (gen.) <br /> Visibility: 1.00 (a vg.) <br />Material consistency description : Job efficiency : 0.83 (1shift/day) <br />Consolidated stockpile Spoil pile : 0.70 (fnd-mt) <br /> Push gradient : 1.00 (Cat HB) <br />Average push gradient : 0.00 % (pos) Altitude : 0.96 (Cat HB) <br />Average site altitude : 11,700 feet Material weight : 0.79 (Cat HB) <br /> Blade type : 1.00 (PAT) <br />Material weight : 2,900 Ibs/LCY Net correction : 0.33 <br />Weight description : <br />Decomposed rock - 50% Rock, 50% Earth <br />Adjusted unit production <br />Adjusted fleet production <br />JOB TIME AND COST <br />Fleet size : 1 Dozer(s) <br />Unit cost : $0.524 /LCY <br />Permit/job# :P-2011-011 <br />Abbreviation :none <br />Filename: P01 1-006 <br />153.99 LCY/hr <br />153.99 LCY/hr <br />Total job time : 5.27 <br />Total job cost : $425 <br />Hours
The URL can be used to link to this page
Your browser does not support the video tag.