Laserfiche WebLink
PROJECT IDENTIFICATION <br />Task #: 007 <br />Date : 0610612011 <br />User : RCO <br />Agency or organization name: DRMS <br />Permit or other job action :New NOI <br />Task description :Rip compaction on road and pads <br />HOURLY EQUIPMENT COST <br />Basic machine : Cat D5G LGP - 5P <br />Blade type :Power Angle Tilt <br />Attachment no. 1 :BOPS Cab <br />Attachment no. 2:3-shank ripper <br />Horsepower : 90 <br />Shiftbasis : 1 per day <br />Utilization % <br />Cost Breakdown : Ownership cost/hour : $17.85 NA <br />Dozer operating cost/hour : $24.13 100 <br />Ripper operating cost/hour : $1.93 100 <br />Operator cost/hour : $38.54 NA <br />Total unit cost/hour : $82.45 Total fleet cost/hour : $82.45 <br />MATERIAL QUANTITIES <br />Selected estimating method : Area <br />Alternate methods - <br />Seismic : NA NA Load factor <br />Area : 1.61 acres Rip depth (ft) <br />Source of estimated quantity :NOI <br />Source of estimated load factor :NA <br />HOURLY PRODUCTION <br />Alternate methods - <br />Seismic : Seismic velocity : NA feet/second <br />Unadjusted production : NA cu. yds./hour <br />Area : Avg. ripping depth : 1.00 feet/pass <br />Average ripping width : 5.08 feet/pass <br />Average ripping length : 200.00 feet/pass <br />Average dozer speed : 88.00 feet/minute <br />Average maneuver time : 0.25 minutes/pass <br />Production per unit area : 0.555 acres/hour <br />Unadjusted production : 894.97 cu. yds./hour <br />JOB TIME AND COST <br />Fleet size : 1 dozer(s) <br />Unit cost : $0.116 per cu. yd. <br /> <br />CIRCES Cost Estimating Software <br />BULLDOZER RIPPING WORK <br />State : Colorado Permit/job #:P-2011-011 <br />County :Mineral Abbreviation :none <br />Site :East Upper Rat Creek Filename :P011-007 <br />NA Bank volume <br />1.00 Volume <br />NA <br />2,597 <br />BCY <br />BCY or CCY <br />J ? V]IUMU1I %aUf-l",ULIUI I rdV0.11A - <br />Unadjusted production <br />per selected method : 894.97 cu. yds./hour <br />Site altitude : 11,700 feet <br />Altitude adjustment : 0.96 (Cat HB) <br />Job efficiency factor : 0.83 (1 shift/day) <br />Net job correction : 0.80 multiplier <br />Adjusted unit production : 713.12 cu. yds./hour <br />Adjusted fleet production : 713.12 cu. yds./hour <br />Total job time : 3.64 hours <br />Total job cost : $300