My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-06-07_REVISION - M1998024
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1998024
>
2011-06-07_REVISION - M1998024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 11:44:25 AM
Creation date
6/9/2011 8:11:53 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1998024
IBM Index Class Name
REVISION
Doc Date
6/7/2011
Doc Name
Notice of surety increase (SI-02)
From
DRMS
To
Oldcastle SW Group, Inc.
Type & Sequence
SI2
Email Name
DMC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BULLDOZER RIPPING WORK <br />Task description: Rip/grade pit floor and access roads <br />Site: Hidden Valley Gravel Pit Permit Action: 2011 Midterm Review Permit/Job#: M1998024 <br />PROJECT IDENTIFICATION <br />Task #: 03A State: Colorado Abbreviation: None <br />Date: 6/6/2011 County: Eagle Filename: M024-03a <br />User: DMC <br />Agency or organization name: DRMS <br />Seismic: <br />Area: <br />HOURLY EQUIPMENT COST <br />Basic Machine: Cat D8R Series II - 8U <br />(2005) <br />Ripper Attachment: 3-Shank Ripper <br />Cost Breakdown: <br />Horsepower: 310 <br />Shift Basis: 1 per day <br />Data Source: (CRG) <br /> Utilization % <br />Ownership Cost/Hour: $45.97 NA <br />Operating Cost/Hour: $81.13 100 <br />Ripper Operating Cost/Hour: $6.37 100 <br />Operator Cost/Hour: $38.49 NA <br />Total Unit Cost/Hour: $171.95 <br />Total Fleet Cost/Hour: $171.95 <br />MATERIAL QUANTITIES Selected estimating method: Area <br />Alternate Methods: <br />NA Bank Volume: NA BCY <br />Area: <br />26 acres Rip Depth (ft): 2.00 <br />Source of estimated quantity: Onsite observations / <br />HOURLY PRODUCTION <br />Seismic: <br />Seismic Velocity: NA <br />feet/second <br />Average Ripping Depth: 2.00 mph <br />Average Ripping Width: 7.08 degrees <br />Average Ripping Length: 500.00 feet <br />Average Dozer Speed: 88.00 feet <br />Average Maneuver Time: 0.25 feet <br />Production per unit area: 0.822 acres/hour <br /> <br />Job Condition Correction Factors <br />Unadjusted Hourly Unit Production: 0.822 Acres/hr <br /> <br />Site Altitude: 6,350 feet <br />Altitude Adj: 1.00 (CAT HB) <br />Job Efficiency: 0.83 (1 shift/day) <br />Net Correction: 0.83 multiplier <br />Adjusted Hourly Unit Production: 0.68 Acres/hr <br />Adjusted Hourly Fleet Production: 0.68 Acres/hr <br /> <br />JOB TIME AND COST <br />Fleet size: 1 Grader(s) Total job time: 38.11 Hours <br />Unit cost: $252.026 Per acre Total job cost: $6,553.00 <br /> CIRCES Cost Estimating Software <br />Volume: 83,893 BCY or CCY <br />NA
The URL can be used to link to this page
Your browser does not support the video tag.