Laserfiche WebLink
Mobilization Worksheet Cont'd Task # 07A Page 2 of 2 <br />EOUIPMENT HAUL DISTANCE and Time <br />Nearest Major City or Town within project area region: <br />Total one-way travel distance: <br />Average Travel Speed: <br />Total Non-Roadable Mob/Demob Cost * <br />`* two round trips with haul rig: <br />Total Roadable Mob/Demob Cost ** <br />** one round trip, no haul rig: <br />Transportation Cycle Time: <br />Haul Time (Hours): <br />Return Time (Hours): <br />Loading Time (Hours): <br />Unloading Time (Hours): <br />Subtotals: <br />JOB TIME AND COST <br />EAGLE <br />20.00 miles <br />50.00 mph <br />$3,188.04 <br />$16.73 <br />Non-Roadable <br />Equipment Roadable <br />Equipment <br />0.40 0.40 <br />0.40 0.40 <br />0.50 NA <br />0.50 NA <br />1.80 0.80 <br />Total job time: 3.60 Hours <br />Total job cost: $3,204.77 <br />CIRCES Cost Estimating Software