My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-06-01_PERMIT FILE - P2011009
DRMS
>
Day Forward
>
Permit File
>
Prospect
>
P2011009
>
2011-06-01_PERMIT FILE - P2011009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:33:59 PM
Creation date
6/9/2011 7:42:24 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
P2011009
IBM Index Class Name
PERMIT FILE
Doc Date
6/1/2011
Doc Name
Reclamation cost estimate and NOI is approved
From
DRMS
To
Grayling LLC
Email Name
RCO
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />EQUIPMENT MOBILIZATION / DEMOBILIZATION <br />PROJECT IDENTIFICATION sheet 1 of 2 <br />Agency or organization name : DRMS <br />Task #: 005 State : Colorado Permit/job # : P-2011-009 <br />Date : 0610212011 County :Ouray Abbreviation :none <br />User : RCO Site :Lower Mountain Top Filename :P009-005 <br />Permit or other job action :New Noi <br />Task description :Haul reclamation equipment to and from site <br />EQUIPMENT TRANSPORT RIG COST Shift basis : 1 per day <br /> Cost data source : CRG Data <br />Truck tractor description : Generic on-highway truck tractor, 6x4, diesel powered, 400 HP (2nd half, 2006) <br />Truck trailer description : Generic folding gooseneck, drop deck equipment trailer (25T, 50T, and 100T) <br />Available rig capacities : 0-25 Tons 26-50 Tons 51+ Tons <br />Cost Breakdown : Ownership cost/hour : $16.63 $18.37 $22.33 <br />Operating cost/hour : $44.38 $46.13 $50.07 <br />Operator cost/hour : $27.66 $27.66 $27.66 <br />Helper cost/hour:, $0.00 $25.39 $25.39 <br />Total Unit Cost/hour : $88.67 $117.55 $125.45 <br />NON-ROADABLE EQUIPMENT <br />Machine <br />Description Weight/unit <br />(Tons) Ownership <br />Cost/hr/unit Haul Rig <br />Cost/hr/unit Fleet Size <br />(No. units) Haul Trip <br />Cost/hr/fleet Return Trip <br />Cost/hr/fleet DOT permit <br />Cost/fleet <br />-Cat D6R - 6S (2003) 22.86 $27.06 $88.67 1 $115.73 $88.67 $0.00 <br />-CA T914G 8.10 $11.24 $88.67 1 $99.91 $88.67 $0.00 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Subtotals : $215.64 $177.34 $0.00
The URL can be used to link to this page
Your browser does not support the video tag.