Laserfiche WebLink
ROADABLE EQUIPMENT <br />EQUIPMENT HAUL DISTANCE and TIME <br />Nearest major city or town within project area region <br />Transportation Cycle Time : Non- Total one-way travel distance <br />Roadable Roadable Average travel speed <br />Equipment Equipment <br />Haul time (hours) = 1.29 1.29 <br />Return time (hours) = 1.29 1.29 <br />Loading time (hours) = 0.50 NA <br />Unloading time (hours) = 0.50 NA <br />Subtotals = 3.57 2.57 <br />Total non-roadable mob/demob cost * : <br />* two round trips with haul rig <br />Total roadable mob/demob cost ** : <br />** one round trip, no haul rig <br />sheet 2 of 2 <br />Montrose <br />45.0 miles <br />35.0 mph <br />$1,441.78 <br />$0.00 <br />JOB TIME AND COST Total job time : 7.14 hours <br />Total job cost : $1,442