Doc Name
Weekly Construction Quality Assurance ("CQA") Reports- 5/8/11 & 5/15/11.
From
CC&V
To
DRMS
Type & Sequence
AM9
Email Name
BMK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
amecO <br />surface at least 4 times (method compaction technique was applicable). Fill temperatures were <br />monitored by an AMEC field representative during ambient temperatures below 32°F and <br />found be acceptable. <br />D) Soil Liner Fill <br />1) VLF <br />No work performed during the week. <br />E) High Volume Solution Collection System <br />1) High Volume Solution Collection Piping <br />No placement performed during the week. <br />2) Drain Cover Fill (DCF) <br />No work performed during the week. <br />F) Leak Detection Trench <br />1) VLF <br />A portion of the leak detection system was installed between stations H11+00 (+/-) to H15+00 <br />(+/-) approximately 150 left of centerline. The 1'xF trench was excavated using a CAT 312 <br />excavator. 40mil HDPE geomembrane and 12oz/ft2 geotextile were placed in the trench. <br />Three-inch CPe pipe was then placed over the geotextile. Approved leak detection fill (LDF) <br />was placed in the trench using a CAT 950 front-end loader and laborers. The geotextile was <br />wrapped and overlapped, encapsulating the LDF and 3" CPe pipe. SLF material was then <br />placed over the trench. Leak detection trench construction was observed and inspected by an <br />AMEC field representative and found to be constructed in accordance with design drawing and <br />project specifications. <br />II) Storm Water Management <br />A) Best Management Practices <br />Best Management Practices are being observed throughout the Phase 5 VLF Project. <br />111) Material Processing <br />A) Drain Cover Fill Process Area <br />No Drain Cover Fill (DCF) was processed during the week. <br /> <br />Location This Week Cumulative <br />Comments <br /> (tons) tons <br />DCF Process 0 121,223 <br />Total 0 121,223 <br />IV)VLF Geosynthetics <br />A) Geomembrane Installation <br />1) VLF <br />No work performed during the week. <br />VLF Weekly Report WE 05.21.2011