Laserfiche WebLink
;T_8L P Trucking <br />31034 County Rd 24 <br />Springfield, CO 81073 <br />June 3, 2011 <br />m - :Zo// - 0z l <br />vJared Ebert RECEIVED <br />?? <br />Div. Of Reclamation, Mining, and Safety N 0 6 Z o/i <br />1313 Sherman St Room 215 <br />Denver Colorado 80203 9 S 11? <br />Dear Mr. Ebert, ???,?* <br />Please find below our responses to the Preliminary Ad?uacy Review #1. <br />6.4.3 Exhibit C - Pre-mining and Mining Plan Map(s) of Affected Lands <br />1.) Fences within 200' of proposed permitted area have been added to the <br />Mining Phases map. Please see enclosed Mining Phases map. <br />2.) The name of the owner(s) of each of the structures depicted on the <br />"Mining Phase, Man-Made Structures, and Existing Two Track" map have <br />been added. Alley Land and Cattle, Inc owns all structures depicted, <br />except for Baca County Rd G. <br />3.) All maps have been signed by the preparer. Please see enclosed maps. <br />4.) Please see enclosed "Mining Phase, Man-Made Structures, and Existing <br />Two Track" map. Phases have been labeled. <br />6.4.4 Exhibit D - Mining Plan <br />5.) The Two Track Ranch Road used to access the Pit will not be substantially <br />improved and upgraded for the mining operation. The Two Track Ranch <br />Road is going to be improved by Alley Land and Cattle, Inc, for their use, <br />and it is their request that this Ranch Road be used to access the Pit as <br />well. Please see enclosed Notarized agreement between the Applicant <br />and Landowners detailing handling of Ranch Road following completion of <br />all phases of mining. <br />6.) J&P Trucking commits to not processing the top 1-4 inches of topsoil. J&P <br />Trucking also commits to stripping the top 1-4 inches of topsoil material <br />and stockpiling it for reclamation. <br />7.) Topsoil stockpiles will be planted with Western Wheatgrass at 8 <br />PLS/Acre. <br />8.) Highwalls will be created as mining progresses. They will be approximately 300' or less in length, <br />and approximately 8 to 10' high, at any given time during mining. <br />9.) J&P Trucking commits to completing all the steps required for reclamation in one mining <br />phase prior to continuing to the next mining phase.