Laserfiche WebLink
Mr. Kent Gorham <br />June 3, 2011 <br />Page 3 <br />NECC response: With the changes approved as part of TR-56, there is no need to revise <br />pages 2.04-8 to 11 g and the text pages 2.04-5 to 31 (not all inclusive) under PR02. <br />Please withdraw those pages from consideration. <br />3. DRMS: Page v, List of Figures is missing TR-55 Bates Portals figures 5a and 17a. <br />NECC response: Page v, List of Figures has been updated. <br />4. DRMS: Page vii, List of Exhibits will now need to be page viii due to the expansion of <br />the map list. <br />NECC response: The List of Exhibits is included on page viii. <br />5. DRMS: On page vi, List of Maps, please correct Map 11 a to read Apache Canyon Shafts <br />and correct Map 13a title for the silo drainage as per TR-55. Also, Map 6 should be <br />identified as Surface Bedrock and Geology (Refuse Area). <br />NECC response: Page vi, List of Maps has been corrected. <br />6. DRMS: Pages 2.04-11 a to l lg cannot be inserted into the hard copy of the approved <br />permit because current page 2.04-11 is a two sided page with 2.04-12 on the second side. <br />NECC response: This was corrected with the TR 56 submittal. <br />7. DRMS: Existing Table 7 on page 2.04-18 is being inadvertently eliminated by the <br />revised materials. <br />NECC response: Table 7 is included on the bottom of page 2.04-17 revised under TR56. <br />8. DRMS: On page 2.04-24 the text narrative states "windmills south of the river are owned <br />by WFC". Please correct the permit text to properly identify windmill ownership. <br />NECC response: Page 2.04-24 has been modified to state "windmills south of the river <br />are owned by the Division of Wildlife." <br />Rule 2.05 Operation and Reclamation Plan <br />9. DRMS: Please ensure that permit text narrative on or around page 2.05-3 clearly states <br />what mining activities are proposed under PR-02, while retaining all previous mine plan <br />approval narrative. Reference to Map 3 is appropriate. <br />NECC response: Pages 2.05-2, 3 and 3a are submitted as narrative of the mining <br />activities associated with Map 3-2011 Mine Plan. <br />10. DRMS: What additional surface and ground water monitoring is proposed for the mine <br />plan proposed under PR-02?