Access Road <br />Work Plan <br />Summary: <br />• Obtain access road design, construction, inspection and maintenance approval from <br />the Division of Reclamation Mining and Safety' <br />• Obtain Stormwater Construction Permit from Colorado Department of Public Health <br />and the Environment(CDPHE) and approval from La Plata County; <br />• Pre-Construction Activities <br />¦ Utilizing engineering drawings and topographic features (CLC Associates <br />Attachment A-Sheets 1 thru 21); <br />¦ Delineate permit boundaries with permit boundary markers with flags and or <br />stakes; <br />¦ Establish Profile and Cross Section Stakes-for construction purposes. (See <br />Attachment A); <br />¦ Establish cut and fill stakes per the engineering drawings (See Attachment A - <br />CLC Associates); <br />¦ Delineate areas for temporary storage of debris, and wood. The boundary of the <br />storage area will be marked with stakes and or flagging tape <br />¦ Identify permit and work area boundaries with flagging tape <br />Construction Summary and Scheduling <br />• Establish health and safety procedures; <br />• Establish site management communication protocols; <br />• Establish site maintenance requirements; <br />• Establish grade stakes in accordance with approved design drawings; <br />• Remove materials from inside road cuts using a dozer (Cat 650 or similar model); <br />• Install pre-construction BMPs: <br />¦ Catch basins(Attachment A- Sheet C4.92-CLC Associates)/rock check <br />dams(backhoe); <br />¦ Inside Road Ditches (backhoe/dozer); <br />¦ Wattles (erosion logs)/Rock barriers (manual labor); (Attachment A- Sheet C4.90- <br />CLC Associates) <br />¦ Cross Drains (backhoe/dozer); <br />¦ Straw bales(manual labor) (Attachment A- Sheet C4.92-CLC Associates); <br />¦ Ditch check dams(manual labor); and <br />¦ Wetland barriers (manual labor). <br />[Publish Date] <br />4