My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-06-06_REVISION - M1981185 (62)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1981185
>
2011-06-06_REVISION - M1981185 (62)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:58:14 PM
Creation date
6/7/2011 8:30:28 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1981185
IBM Index Class Name
REVISION
Doc Date
6/6/2011
Doc Name
Response to CN-01 3rd addequacy issues for 112d-1 application part 1 attachment A thru D
From
R Squared Inc.
To
DRMS
Type & Sequence
CN1
Email Name
WHE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
128
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Response to CN-01 Third Adequacy Issues - June 6, 2011 <br />Adequacy Issue #27 <br />The application states the mill facility and steel sets at May Day 1 level will be dismantled to the <br />maximum extent possible. Please clarify, "maximum extent possible." If there exists a safety <br />hazard in removing the inner most steel sets, affixed to or under cutting the native ground of the <br />highwall, please state such. Otherwise, please revise the reclamation plan to indicate total <br />dismantlement of the mill facility, steel sets and rubblization of the concrete floor and foundation <br />for the mill facility. The Division cannot approve burial of intact surface structures as permanent <br />reclamation. The Division considers the mill building to be a surface structure, with or without a <br />soil cover. <br />Response #27 <br />Wildcat Mining is submitting a revised reclamation plan to indicate the total <br />dismantlement of the mill facility, steel sets and rubblization of the concrete floor and <br />foundation for the mill facility. See Attachment L These materials will be recycled or <br />buried in dry underground mined out areas <br />Adequacy Issue #28 <br />Regarding compliance with the ground water regulations, please see the review memorandum <br />prepared by Division staff member David Bird. Please address the adequacy issues identified by <br />Mr. Bird in his attached review memorandum, dated May 3, 2011. <br />Response #28 <br />Response to Mr. Bird's adequacy questions is included as Attachment M <br />Exhibit H- Wildlife, Rule 6 4 8 <br />Adequacy Issue #29 <br />Please ensure the application for CN-01 includes a copy of the recommendations from the <br />Colorado Division of Wildlife, as required under Rules 6.4.8(2) and 6.4.21(1). If the Applicant <br />believes the application already contains copy of the recommendations from the Colorado <br />Division of Wildlife (DOW), please clarify the date of the DOW document and specify the <br />location of the document within the application materials. <br />Response #29 <br />Wildcat Mining is providing a the letter presenting the comments and recommendations of <br />the Colorado Division of Wildlife ("DOW"), Durango Office, at Attachment N, as required <br />under Rules 6.4.8(2) and 6.4.21(l). Wildcat Mining met to discuss these matters in the field <br />with Mr. Trevor Balzer, DOW, on May 17, 2011, and previously met with Ms Patt Dorsey, <br />Revised <br />6/6/2011 <br />22
The URL can be used to link to this page
Your browser does not support the video tag.