I <br />Response to CN-01 Third Adequacy Issues - June 6, 2011 <br />• The access roads identified have been removed from Figure F-4 and Figure F-4A. <br />See Attachment C; <br />• Figure 4 and 4A have been combined See Attachment C, <br />• The area referenced on Figure F-4A is pre-existing or undisturbed Th_e <br />Reclamation Plan only provides that "disturbed" areas will be reduced to 1 5H 1V <br />Figure F-4A is, therefore, consistent with the Reclamation Plan, <br />• The shed and outhouse shown on Figure F-5 are pre-existing and will not be <br />reclaimed; Wildcat Mining does not propose to use this shed or outhouse in its <br />mining activities; <br />• Figure F-5a has been revised to show the final configuration of the entire Chief <br />Portal area. See Attachment C• and <br />• The highwall referenced in Figure F-5 is pre-existing or undisturbed The <br />Reclamation Plan only provides that "disturbed" areas will be reduced to 1.511:1v. <br />Figure F-5 is, therefore, consistent with the Reclamation Plan <br />Adequacy Issue #11 <br />The amended application includes approximately 32 maps, yet many of the existing and <br />proposed mine features are not shown correctly. Figure D-1 attempts to provide some details for <br />the mine plan at the May Day 1 level but incorrectly labels the mill facility as "Storage", <br />incorrectly locates the two water tanks, and shows contour lines on top of the structures. Please <br />revise Figure D-1 to correct these inadequacies. Please provide similar scale maps to support the <br />mine plan for each of the areas of affected lands. Please correctly locate the major mine features, <br />including but not limited to all underground mine openings, mine benches, material stockpile <br />areas, the proposed mill facility, and any structures utilized to support the mining and milling <br />operation. Please submit detailed and correct maps, which are compliant with the basic map <br />requirements of Rule 6.2.1(2), and clearly delineate and label the existing and proposed mine <br />features. <br />Response #11 <br />Wildcat Mining is submitting revised maps which comply with Rule 6.2.1(2.) and which <br />clearly delineate and label the existing and proposed mine features, including those <br />identified by DRMS in this adequacy issue See Attachment C <br />Adequacy Issue #12 <br />The Division had previously requested a surface map which identifies the glory hole, associated <br />with the May Day 1 workings, and other pre-permit mine features associated with the historic <br />May Day and Idaho mines. The Applicant's response affirmed the glory hole, and other pre- <br />permit mine features, were located on several of the submitted maps. The glory hole is not <br />identified on any map. Please submit a surface map which delineates and labels the glory hole, <br />associated with the May Day 1 workings, and other pre-permit mine features associated with the <br />Revised <br />6/6/2011 <br />11 <br />mow.. ??_