Response to CN-01 Third Adequacy Issues - June 6, 2011 <br />• Please avoid the splitting of small areas onto multiple maps. Please combine <br />Figures F-4 and F-4A onto one map. Please show the entire 8.2 acres of <br />reclaimed lands for the Pay Day and Idaho claims on one map. <br />• Figure F-4A indicates an 11 foot highwall at 1 H:1 V slope, which is in conflict <br />with the 2H:1 V slope described in the reclamation plan. <br />• Figure F-5 shows a shed and an outhouse, not discussed in the reclamation plan. <br />• Figure F-5a redirects the Division to a different map for details of the final <br />configuration of the reclaimed area. Figure F-5a covers an area of 0.3 acres and <br />the 11 inch by 17 inch paper for Figure F-5a provides sufficient space to show the <br />final configuration of the reclaimed area. Please show the final configuration of <br />the entire Chief Portal area on the reclamation map, as required under Rule <br />6.4.6(a). <br />Figure F-5a indicates a 40+ foot highwall at 0.4H:1 V, which is in conflict with <br />the 1.5H:1 V slope described in the reclamation plan. <br />Response #10 <br />Reclamation Mans <br />#10a - Wildcat Mining is submitting revised reclamation mans showing the expected <br />physical appearance of all affected lands after reclamation has been completed and without <br />surface facilities shown. See Attachment C. <br />#10b - Wildcat Mining is submitting revised reclamations maps delineating and labeling <br />the boundaries of affected lands and where possible showing the permit boundaries. See <br />Attachment C. <br />#10c - Wildcat Mining is submitting revised reclamation maps illustrating transition areas <br />and extending contour lines beyond the boundary of the affected lands See Attachment C <br />#10d - Wildcat Mining is submitting revised reclamation maps removing conflict between <br />reclamation maps and the reclamation plan, and addressing the inadequacies identified by <br />DRMS in the reclamation maps. See Attachment C These revisions include the following <br />• The Filter Press, 35 ton Dry Cake Hopper, portal shed and portions of the Mill on <br />F-1 have been removed. See Attachment C, Figure F-1; <br />• The area referenced on Figure F-1 is pre-existing-or undisturbed The Reclamation <br />Plan only provides that "disturbed" areas will be reduced to 1 5H•1V Figure F-1 is, <br />therefore, consistent with the Reclamation Plan; <br />• The area referenced on Figure F-3 is pre-existing-or undisturbed The Reclamation <br />Plan only provides that "disturbed" areas will be reduced to 1 5H•1V Figure F-1 is, <br />therefore, consistent with the Reclamation Plan; <br />• The sheds are pre-existing, and will not be reclaimed; Wildcat Mining does not <br />propose to use these sheds in its mining activities; <br />Revised <br />6/6/2011 <br />10