Laserfiche WebLink
Fourth Adequacy Response 112(d)-1 Application, Amended CN-01 <br />Wildcat Mining Corporation May Day Idaho Mine Complex <br />Response #4 <br />The Company commits to repairing the above-described portion of the access road to the <br />Incas Mine in the event this portion of the access road should fail. <br />Adequacy Issue #5 <br />In the Division's third adequacy letter, under adequacy number 16, the Division indicated review <br />of the proposed Storm Water Management Plan (SWMP) was not yet completed. The Division <br />is still reviewing the proposed SWMP, which was amended in response to adequacy issues <br />previously raised by the Division <br />Response #5 <br />Stormwater Management Plan has been submitted as Attachment D to the Company's <br />response to CN-01 Third Adequacy Issues. <br />Adequacy Issue #6 <br />In the Division's third adequacy letter, under adequacy item number 41, the Division indicated <br />the documents received on April 18, 2011, did not provide an Attachment K. Such statement <br />was in error. The Division has noted the amended CN-01 included an Attachment K, which <br />contained Exhibit U, Environmental Protection Plan. The application materials submitted by the <br />Applicant for CN-01 exceed 1,400 pages. The Division would appreciate the Applicant's <br />cooperation in organizing and managing the application materials. Please simplify future <br />submittals by avoiding the use of multiple and unnecessary layers of attachments, as well as <br />attachment names which confuse the names of the Exhibits required under the Act and Rules. <br />Examples of confusion in the amended CN-01 include, but are not limited to, the following: <br />• Exhibit A, Legal Description, was located in Attachment D. <br />• Exhibit C, Pre-mining and Mining Plan Maps, was located in Attachment J. <br />• Exhibit D, Mining Plan, was located in Attachment E-1 of Attachment E. <br />• Exhibit F, Reclamation Plan Maps, was located in Attachment C. <br />• Exhibit G, Water Information, was located in Attachment H. <br />• Exhibit M, Other Permits and Licenses, was located in Attachment E-3 of <br />Attachment E. <br />• Exhibit T, Permanent Man-Made Structures, was located in Attachment I. <br />• Exhibit U, Environmental Protection Plan, was located in Attachment K. <br />• Attachment E directed the Division to Attachment E-5 for portions of Exhibit 6.5 <br />and Table 6.5-1, Chief Drainage Channel Flow Calculations. Attachment E-5 <br />contained only one table, Table T5-1, Analyte Laboratory Test, which was not <br />legible. Please submit an enlarged and legible version of Table T5-1. Please <br />clarify whether the Applicant intended to direct the Division to Table SWMP-A <br />6/6/2011