My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-06-06_REVISION - M1981185 (61)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1981185
>
2011-06-06_REVISION - M1981185 (61)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:58:14 PM
Creation date
6/7/2011 8:03:48 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1981185
IBM Index Class Name
REVISION
Doc Date
6/6/2011
Doc Name
Response to 2nd & 3rd geotechnical adequacy issues (CN-01)
From
R Squared Inc.
To
DRMS
Type & Sequence
CN1
Email Name
WHE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
R 21NCORPORATED <br />ENVIRONMENTAL AND ENGINEERING SERVICES <br />STRATEGICALLY POSITIONED-TECHNICALLY PREPARED <br />May 27, 2011 <br />Mr. Wallace Erickson <br />Department of Natural Resources <br />Division of Reclamation Mining and Safety <br />1313 Sherman Street, Suite 215 <br />Denver, Colorado 80203 <br />Dear Mr. Erickson; <br />DRMS Geotechnical Stability Response <br />April 18, 2011 Comments <br />Mining, Reclamation and New Access Road <br />Wildcat Mining Corporation, May Day Idaho Mine Complex, <br />File No. M-1981-185, CN-01 <br />GEORGE M.L. ROBINSONP.G. <br />1. ERICH RALIBERP.E. <br />RIECEN <br />JUN 00 2U11 <br />Division of Rec,Mation, <br />Mining and Safety <br />The following responds to the second and third geotechnical adequacy issues in connection with <br />the subject project: <br />Adequacy Issue #1 -Geotechnical Stability Response to DRMS April 18, 2011 Comments <br />In Response 415, the Applicant states the revised work plan for the access road has been <br />resubmitted as a new Exhibit 6.5. In Exhibit 6.5, the Applicant states the new access road <br />construction work plan including erosion and sedimentation BMPs are summarized in <br />Attachment 6.5.2. The Division did not receive Attachment 6.5.2. <br />Response #1- Geotechnical Stability Response to DRMS-April 18, 2011 Comments <br />The road design, base of operations including BMPs are included in Attachment F CLC <br />Road Design- Third Adequacy Response <br />Adequacy Issue #2- Geotechnical Stability Response to DRMS April 18, 2011 Comments <br />If the Applicant intended to refer the Division to Attachment 6.5-2 submitted on November 10, <br />2010, please respond to the Division's adequacy questions pertaining to the attachment <br />(questions #5 through # 18 in the March 7, 2011 Access Road memorandum) and provide the <br />additional work plan details requested by the Division in previous geotechnical memos. <br />"Strategically Positioned - Technically Prepared" <br />5555 DTC Parkway Suite A4000, Greenwood Village, Colorado 80111 <br />Phone: (303) 832-7664 Fax: (303) 832-7469
The URL can be used to link to this page
Your browser does not support the video tag.