Laserfiche WebLink
Task # OSA Page 2 of 2 <br />Mobilization Worksheet Cont'd <br />EOUIPMENT HAUL DISTANCE and Time <br />Nearest Major City or Town within project area region: <br />Total one-way travel distance: <br />Average Travel Speed: <br />Total Non-Roadable Mob/Demob Cost * <br />`* two round trips with haul rig: <br />Total Roadable Mob/Demob Cost ** <br />** one round trip, no haul rig: <br />Transportation Cycle Time: <br />Haul Time (Hours): <br />Return Time (Hours): <br />Loading Time (Hours): <br />Unloading Time (Hours): <br />Subtotals: <br />JOB TIME AND COST <br />Non-Roadable I Roadable <br />Equipment Equipment <br />1.25 1.25 <br />1.25 1.25 <br />50 NA <br />0.50 NA <br />z % 2.50 <br />GRAND JUNCTION <br />50.00 miles <br />40.00 mph <br />$3,970.00 <br />$32.25 <br />Total job time: 7.00 Hours <br />Total job cost: $4,002.25 <br />CIRCES Cost Estimating Software <br />J a :c_?4