My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-05-27_INSPECTION - M1980203
DRMS
>
Day Forward
>
Inspection
>
Minerals
>
M1980203
>
2011-05-27_INSPECTION - M1980203
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:33:53 PM
Creation date
6/1/2011 9:15:39 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980203
IBM Index Class Name
INSPECTION
Doc Date
5/27/2011
Doc Name
Inspection report
From
DRMS
To
Currier Gravel Pit, Inc.
Inspection Date
5/20/2011
Email Name
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 1 of 2 <br />Task description: <br />Site: Currier Gravel Pit <br />PROJECT IDENTIFICATION <br />Task #: 05A State: Colorado <br />Date: 5/26/2011 County: Mesa <br />User: THM <br />Agency or organization name: DRMS <br />EQUIPMENT TRANSPORT RIG COST <br />Permit/Job#: M1980203 <br />Abbreviation: None <br />Filename: M203-05a <br />Shift basis: 1 per day <br />Cost Data Source: CRG Data <br />Truck Tractor Description: GENERIC ON-HIGHWAY <br />400 R CND RA TOR, 2006)6X4, DIESEL POWERED, <br />HP , <br />Truck Trailer Description: GENERIC FOLDING GOOSENECK, DROP DECK EQUIPMENT TRAILER <br />(25T, 50T, AND 100T) <br />Cost Breakdown: <br />Available Rig Capacities 0-25 Tons 26-50 Tons 51+ Tons <br />Ownershi Cost/Hour: $16.63 $18.37 $22.33 <br />O eratin Cost/Hour: $44.38 $46.13 $50.07 <br />O erator Cost/Hour: $27.66 $27.66 $27.66 <br />Helper Cost/Hour: $0.00 $25.39 $25.39 <br />Total Unit Cost/Hour: $88.67 $117.55 $125.45 <br />?,?wT nn Ail AR7 Ti FniTiPMENT, <br />Machine Weight/ Owner ship Haul Rig Fleet Haul Trip Return Trip DoOs? fleet it <br />Description Unit cost/hr/ unit Cost/hr/unit Size Ccst/hr/ <br /> <br />Cat D7R DS Series (TONS) <br />31.25 <br />$43.55 <br />$117.55 <br />1 fleet <br />$161.10 <br />$117.55 <br />$250.00 <br />II-7SU <br /> <br />Drill/Broadcast <br /> <br />25.00 <br /> <br />$39.59 <br /> <br />$88.67 <br /> <br />1 <br /> <br />$128.26 <br /> <br />$88.67 <br /> <br />$250.00 <br />------- <br />Seeder with Tractor <br />00 <br />6 <br />03 <br />$7 <br />$88.67 <br />1 <br />$95.70 <br />$88.67 <br />$250.00 <br />Power Mulcher . . <br />Reinco M90 <br />Subtotals: 1 $385.00 $294.59 1 a i :)v.uu <br />EQUIPMENT MOBILIZATION/DEMOBILIZATION <br />X4-hM7atinn - <br />Permit Action: SI-01 <br />ID nAnAi UP, F.01TiPMENT: <br />Machine Description Total Cost/hr/ unit Fleet Size Haul Trip <br />Cost/hr/ fleet Return Trip <br />Cost/hr/ fleet <br />[ <br />Li ht Du Pickup , 4x4, 3/4 T. $12.90 1 $12.90 $12.90 <br />Subtotals: I ji iz Yu I a1b.7V <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.