My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-05-25_REVISION - P2010007 (4)
DRMS
>
Day Forward
>
Revision
>
Prospect
>
P2010007
>
2011-05-25_REVISION - P2010007 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 11:33:59 AM
Creation date
6/1/2011 8:45:22 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
P2010007
IBM Index Class Name
REVISION
Doc Date
5/25/2011
Doc Name
Modification application form 2 (MD-03)
From
Rio Grande Silver, Inc.
To
DRMS
Type & Sequence
MD3
Email Name
RCO
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7 (FORM 2 - Public filing) <br />12. List the seed mixture to be used in the re-establishment of vegetation. See the attached seed mixture calculation to obtain <br />PLS/acre. For assistance with formulating seed mixtures and rates, contact the local NRCS if on private land, BLM/USFS if <br />on public land or State Land Board if on state land. <br />A. Provide plant name and seeding rate <br />Plant Name Seeding Rate (PLS/acre) <br />San Luis Slender Wheat Grass 1 4.40 1 <br />Sodar Streambank Wheatgrass I 2.30 I <br />Mountain Brome 1 3.90 1 <br />Fireweed 1 0.25 1 <br />B. Describe the method for seed bed preparation, and application method for grass/forb seeding: <br />Compacted areas will be loosened as necessary by ripping or discing and left in a roughened <br />condition prior to topsoil replacement. Following grading activities, the area will be scarified to help <br />each nitrogen/phosphate) may be applied at a rate of approximate) 100 pounds per acre to the <br />respread topsoil on the drill pads and roads. Seeding will be done by broadcasting a certified <br />weed free speeffies mixture approved by e0lerade ORMS and the USBA Forest Servuee. Seedil lu <br />will be conducted in the late fall and or, early spring to take advantage of moisture availability. <br />V. TERMS AND CONDITIONS FOR PROSPECTING OPERATIONS: <br />3. Reclamation measures shall be fulfilled in a timely manner and completed within five (5) years of completion of prospecting <br />activities. <br />4. The prospecting operations described in this Notice will be conducted in such a manner as to minimize surface disturbances. <br />In addition to the measures required in Rule 5, precautions to be taken include: <br />A. Confinement of operations to areas near existing roads or trails, where practicable. Existing roads which are to remain as <br />permanent roads after prospecting activities are completed shall be left in a condition equal to or better than the pre- <br />prospecting condition; <br />B. Drilling shall be conducted in such a way as to prevent cuttings and fluids from directly entering any dry or flowing <br />stream channel. Drill cuttings must be spread to a depth no greater than one-half (1/2) inch or buried in an approved <br />disposal pit;
The URL can be used to link to this page
Your browser does not support the video tag.