Laserfiche WebLink
May 25,2011 C-1983-059/Terror Creek Loadout JJD <br /> Inspection Topic Summary <br /> NOTE: Y=Inspected N=Not Inspected R=Comments Noted V=Violation Issued NA=Not Applicable <br /> R -Air Resource Protection R -Roads <br /> N -Availability of Records NA -Reclamation Success <br /> N -Backfill&Grading NA -Revegetation <br /> NA -Excess Spoil and Dev.Waste NA -Subsidence <br /> NA -Explosives R -Slides and Other Damage <br /> Y -Fish&Wildlife R -Support Facilities On-site <br /> R -Hydrologic Balance R -Signs and Markers <br /> Y -Gen. Compliance With Mine Plan NA - Support Facilities Not On-site <br /> NA -Other NA - Special Categories Of Mining <br /> R -Processing Waste R -Topsoil <br /> COMMENTS <br /> AIR RESOURCE PROTECTION—Rule 4.17: <br /> There was a moderate volume of stockpiled coal on the facilities bench. Coal haul trucks were unloading <br /> during the inspection.There were no railcars being loaded but there were several fully loaded railcars on site. <br /> There were no signs of fugitive dust being a problem onsite or offsite. <br /> HYDROLOGIC BALANCE -Rule 4.05❑❑Drainage Control 4.05.1,4.05.2,4.05.3; Siltation Structures 4.05.5, <br /> 4.05.6; Discharge Structures 4.05.7,4.05.10; Diversions 4.05.4; Effluent Limits 4.05.2; Ground Water <br /> Monitoring 4.05.13; Surface Water Monitoring 4.05.13; Drainage—Acid and Toxic Materials 4.05.8; <br /> Impoundments 4.05.6,4.05.9; Stream Buffer Zones 4.05.18: <br /> The west side sediment pond that treats runoff from the topsoil stockpile was dry.The combination <br /> spillway was clear of any blockage.The east side sediment pond had a little standing water in it.The gate on the <br /> primary discharge pipe was closed and the emergency spillway was clear of any debris.The pond inslopes were <br /> stable and the pond embankment was well vegetated. <br /> The collection ditches had been recently cleaned out.The ditch cleanings were put into a pile just east of the east <br /> side sediment pond for transfer to the Elk Creek Mine for permanent disposal.Upland diversion water was flowing <br /> through the loadout's diversion ditch and culvert system. <br /> The silt fence and straw bales were in place along the railroad track small area exemption.However,the straw <br /> bales around the drop inlet on the east side of the track area will need to be repaired soon. <br /> PROCESSING WASTE/COAL MINE WASTE PILES—Rule 4.10 and 4.11❑El Drainage Control; Surface <br /> Stabilization; Placement: <br /> There was a small pile of coal waste from the screening process near the east side sediment pond.The coal <br /> waste will be trucked to the Elk Creek Mine for permanent disposal. <br /> Number of Partial Inspection this Fiscal Year: 7 <br /> Number of Complete Inspections this Fiscal Year: 4 <br /> Page 2 of 4 <br />