My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-05-18_PERMIT FILE - C1981012A (2)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981012
>
2011-05-18_PERMIT FILE - C1981012A (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:33:38 PM
Creation date
5/31/2011 9:06:10 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981012A
IBM Index Class Name
Permit File
Doc Date
5/18/2011
Doc Name
SUBSIDENCE CONTROL, MONITORING, AND MITIGATION PLAN
Section_Exhibit Name
Exhibit 24 Subsidence Control, Monitoring, and Mitigation Plan
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
May 11, 2011 <br />4.2.2 Gas Pipeline Monitoring Plan <br />plan: <br />Page 7 <br />To ensure that the control plan is effective, AAI recommends the following monitoring <br />• Pipeline owner(s) should be informed as mining approaches. <br />• Pipeline elevations should be monitored by establishing appropriately located survey <br />points along the segment of a pipeline being undermined, to be spaced at no less than <br />1,000 ft apart. <br />• Annual surveys should be conducted for the operating life of each pipeline. <br />• Structural anomalies reported by the surface owner(s) will be investigated. <br />4.2.3 Worst Possible Consequences of Damage to Gas Pipelines <br />In case the gas pipelines experience horizontal strains in excess of the allowable value, <br />the pipes could be damaged, potentially leading to disruption of gas flow and/or product leakage. <br />4.2.4 Gas Pipeline Damage Mitigation Plan <br />In case monitoring data indicate damage or potential for damage to the pipeline, the <br />following mitigation plan should be adopted. <br />• Appropriate personnel at mine and regulatory authorities, as well as the owner(s) of the <br />pipeline, should be informed. <br />• The mining plan should be re- evaluated to ensure that operations will not further damage <br />the pipeline. <br />4.3 Gas Pipeline Ancillary Structures <br />4.3.1 Gas Pipeline Ancillary Structure Subsidence Control Plan <br />This class of structures includes gas valves, gas fuel valves, gas line drips, gas blow -off <br />valves and gas line test stations. These installations are found on the gas pipeline network and <br />perform as safety and/or control devices. It is anticipated that these installations can be <br />undermined using development -only workings without impacting them. Given the anticipated <br />range of cover depths and width of entries and crosscuts, it is highly unlikely that any perceptible <br />surface deformation will occur. However, surface owner(s) should be notified prior to <br />commencement of room and pillar operations under these installations. <br />4.3.2 Gas Pipeline Ancillary Structure Monitoring Plan <br />A subsidence monitoring plan identical to the gas pipeline monitoring plan is <br />recommended for these structures. <br />Agapito Associates, Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.