My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-05-23_REPORT - M1980244
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2011-05-23_REPORT - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:52:30 PM
Creation date
5/26/2011 11:44:07 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REPORT
Doc Date
5/23/2011
Doc Name
Weekly Construction Quality Assurance ("CQA")
From
CC&V
To
DRMS
Type & Sequence
AM9
Email Name
BMK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
amecs <br />B) Geomembrane Exposure <br />1) VLF <br />Previously installed geomembrane was exposed using a John Deere 35D excavator and <br />laborers between stations E0+00 (+/-) and E4+00 (+/-). The geomembrane was exposed to <br />allow for new geomembrane to be tied in and was observed by an AMEC field representative. <br />C) Anchor Trench <br />1) VLF <br />No work performed during the week. <br />D) Geomembrane Acceptance <br />1) VLF <br />No geomembrane was accepted during the week. <br />E) Geomembrane Delivery <br />1) VLF <br />Two loads (22 rolls) of 80mil LLDPE single sided textured geomembrane rolls were delivered <br />to site during the week. The loads were delivered on a flat bed truck in good condition. The <br />rolls were unloaded using a CAT 950 front-end loader with forks attached. The geomembrane <br />was placed on three pieces of HDPE pipe, stacked two rolls high. An AMEC field <br />representative inventoried the geomembrane and was present at all times during unloading of <br />the geomembrane. <br />CQA ACTIVITIES: <br />SUMMARY: <br />The CQA activities performed consisted of observing, documenting and recording the construction <br />activities of the contractor. <br />AMEC observed slope contouring of the Phase 5 VLF slopes, including hauling excess material to a <br />designated overburden storage area. <br />AMEC observed compaction of subgrade. <br />AMEC observed the excavation and construction of the leak detection trench. <br />AMEC observed the exposure of previously installed geomembrane. <br />AMEC observed and inventoried geomembrane delivered to site. <br />Testing Summary <br />Laboratory testing continued (Particle Size Distribution, Atterberg Limits, Moisture-Density Relations, <br />Specific Gravity, Permeability, and Point Load testing) for sampled materials. <br />VLF Weekly Report WE 05.07.2011
The URL can be used to link to this page
Your browser does not support the video tag.