My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-05-23_REPORT - M1980244
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2011-05-23_REPORT - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:52:30 PM
Creation date
5/26/2011 11:44:07 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REPORT
Doc Date
5/23/2011
Doc Name
Weekly Construction Quality Assurance ("CQA")
From
CC&V
To
DRMS
Type & Sequence
AM9
Email Name
BMK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />amecs <br />VLF EARTHWORKS FIELD MONITORING SUMMARY (WEEKLY REPORT) <br />Project Title: CC&V/ Phase 5 <br />Owner: Cripple Creek & Victor Gold Mining Co. <br />Location: Cripple Creek & Victor Gold Mine <br />Work Element: Phase 5 CQA/ VLF <br />Project No.: 84201 125EO <br />Contractor: Ames Construction Co., Inc. <br />Shift: Day <br />Date: May 7, 2011 <br />Reporting Period: 5/01/11 through 5/7/11 <br />Days S M T W T <br /> <br />Work Shifts <br />D <br />D <br />D <br />D t D <br /> <br />D = Day Shift N = Night Shirt <br />Ambient Temperature Range (F): Low: 16°F to 41 T (+/-) High: 40°F to 70°F (+/-) <br />AMEC CQA: Personnel On-site through the Reporting Period (See Attachment A). <br />AMES: Ames paused work activities for the entire shift on Monday (5/2/2011) due to slick/saturated haul <br />routes, from snowfall <br />CONSTRUCTION ACTIVITIES and PROGRESS: <br />1) EARTHWORKS <br />A) Subgrade Preparation <br />1) VLF <br />A CAT 563 vibratory smooth drum compactor was used to compact subgrade between stations <br />H 11+00 (+/-) and H25+00 (+/-). The subgrade surface was compacted with at least four passes. <br />B) Slope Contouring <br />1) VLF <br />Slope contouring performed between stations J0+00 (+/) and J24+00 (+/-), approximately 600 <br />feet left of centerline to 300 feet right of centerline and between stations H8+00 (+/-) and <br />H14+00 (+/-), approximately 0 to 300 feet left of centerline using two CAT D-6 LGP dozers <br />and one CAT D-9 dozer. Excess material from slope contouring was loaded into one CAT 740 <br />haul truck using a CAT 950 front-end loader and was hauled to an area designated by CC&V. <br />C) Cut to Fill <br />1) VLF <br />No work performed during the week. <br />D) Soil Liner Fill <br />1) VLF <br />No work performed during the week. <br />VLF Weekly Report WE 05.07.2011 <br />{
The URL can be used to link to this page
Your browser does not support the video tag.