<br />amecs <br />VLF EARTHWORKS FIELD MONITORING SUMMARY (WEEKLY REPORT) <br />Project Title: CC&V/ Phase 5 <br />Owner: Cripple Creek & Victor Gold Mining Co. <br />Location: Cripple Creek & Victor Gold Mine <br />Work Element: Phase 5 CQA/ VLF <br />Project No.: 84201 125EO <br />Contractor: Ames Construction Co., Inc. <br />Shift: Day <br />Date: May 7, 2011 <br />Reporting Period: 5/01/11 through 5/7/11 <br />Days S M T W T <br /> <br />Work Shifts <br />D <br />D <br />D <br />D t D <br /> <br />D = Day Shift N = Night Shirt <br />Ambient Temperature Range (F): Low: 16°F to 41 T (+/-) High: 40°F to 70°F (+/-) <br />AMEC CQA: Personnel On-site through the Reporting Period (See Attachment A). <br />AMES: Ames paused work activities for the entire shift on Monday (5/2/2011) due to slick/saturated haul <br />routes, from snowfall <br />CONSTRUCTION ACTIVITIES and PROGRESS: <br />1) EARTHWORKS <br />A) Subgrade Preparation <br />1) VLF <br />A CAT 563 vibratory smooth drum compactor was used to compact subgrade between stations <br />H 11+00 (+/-) and H25+00 (+/-). The subgrade surface was compacted with at least four passes. <br />B) Slope Contouring <br />1) VLF <br />Slope contouring performed between stations J0+00 (+/) and J24+00 (+/-), approximately 600 <br />feet left of centerline to 300 feet right of centerline and between stations H8+00 (+/-) and <br />H14+00 (+/-), approximately 0 to 300 feet left of centerline using two CAT D-6 LGP dozers <br />and one CAT D-9 dozer. Excess material from slope contouring was loaded into one CAT 740 <br />haul truck using a CAT 950 front-end loader and was hauled to an area designated by CC&V. <br />C) Cut to Fill <br />1) VLF <br />No work performed during the week. <br />D) Soil Liner Fill <br />1) VLF <br />No work performed during the week. <br />VLF Weekly Report WE 05.07.2011 <br />{