DAILY FIELD REPORT <br />Project Loveland Ready Mix Slurry Wall Report No. 44 <br />Location Larimer County, Colorado Date 5 May 2008 <br />Client Compass Environmental, Inc. Page I of 1 <br />Contractor Compass Environmental, Inc. File No. 107021-001 <br />Weather Sunny Temperature 60 to 70's F <br />i d1A-%%iT1DA f`Tf1D 9Q A !`TTATTTTT. Q. <br />Contractor Start Work 0700 hrs <br />Contractor Stop Work 1815 hrs <br />Top of Backfill Slope at Start 59+40 <br />To of Backfill Slope at Stop 60+20 <br />Toe of Backfill Slope at Start 61+20 <br />Toe of Backfill Sloe at Stop 62+40 <br />Last Completed Set at Start 61+60 <br />Last Completed Set at Stop 62+50 <br />Verified Area of Excavated Alluvium and Bedrock (Dail) 2,425 S q. Ft. <br />Total Area Excavated To Date 103,735 S q. Ft. <br />Excavator Tye Komatsu PC800 <br />Fresh Slurry Made Yes <br />FIELD REPRESENTATIVE'S ACTIVITIES: <br />Quality Control Number of <br />Samples Location or Batch # Comments <br />Bentonite Slurry - As-Mixed 1 Pond V = 38 s <br />Bentonite Slurry - In Trench 2 61+70,62+40 Met Spec, Sand content 14% for 61+70 <br />Backfill (Slump, Density) 1 59+80 Met Spec <br />Backfill (Gradation) 1 59+80 4200 <br />Backfill (Permeability) -- -- Next permeability sample to be taken around <br />STA 60+00. <br />Verified Clean AM Backfill <br />Slope and Bottom of Key Yes 59+60 through 61+60 Trench cleaned to bottom of key prior to next <br />excavation set. <br />Verified Depth To Bedrock <br />and Key Yes 61+60 through 62+50 Flat bottom (27-28ft) <br />1. Kathryn Peters (KP) of Lyman Henn onsite 0700 hrs. Al informed KP that they would be doing maintenance on <br />machines and safety checks in the morning. They will not be digging until 1100 hrs. KP offsite 0745 hrs. <br />2. KP back onsite at 1130 hrs for testing and observations. Rick from Compass informed KP that only one batch of backfill <br />was made, therefore KP only took 1 backfill sample. <br />3. Performed quality control testing on slurry and Backfill. Observed backfill and excavation operations. Other tests <br />performed yielded results in general accordance with project specifications. Test results were reported to Al of <br />Compass. Prepared Daily Field Report and updated slurry wall data spreadsheet. <br />ATTACHMENTS: None <br />Field Representative(s) Time on/off site Total <br />Kathryn Peters 0700/0745 9 <br />1130/530 <br />Distribution: Jeff Sallas; file <br />C:\107021-001 Ready Mix\107021-000 Loveland Ready Mix Slurry Wall\C. Lyman Henn Inc. <br />Construction\C.4 Field Reports\Daily Reports\DFR's\DFR 080505.doc