My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-10-08_REVISION - M2006080 (7)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2006080
>
2008-10-08_REVISION - M2006080 (7)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 5:48:19 PM
Creation date
5/26/2011 8:17:06 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2006080
IBM Index Class Name
REVISION
Doc Date
10/8/2008
Doc Name
Slurry Wall Constr. Rpt.- Pt.2,Compass Daily Field Rpts.
From
Loveland Ready-Mix Concrete
To
DRMS
Type & Sequence
TR1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
90
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DAILY FIELD REPORT <br />Project Loveland Ready Mix Slurry Wall <br />Location Larimer County, Colorado <br />Client Compass Environmental, Inc. <br />Contractor Compass Environmental, Inc. <br />Weather Partly Cloudy and windy <br />1. CONTRACTOR'S ACTIVITIES: <br />Report No. 38 <br />Date 25 April 2008 <br />Page 1 of 1 <br />File No. 107021-001 <br />Temperature 40's - 60's F <br />Contractor Start Work 0700 hrs <br />Contractor Stop Work 1800 hrs <br />Top of Backfill Slope at Start 53+40 <br />To of Backfill Sloe at Stop 54+50 <br />Toe of Backfill Sloe at Start 55+10 <br /> <br />Toe of Backfill Slope at Stop _ <br />56+50 <br />Last Completed Set at Start 56+30 <br />Last Completed Set at Stop 56+90 <br />Verified Area of Excavated Alluvium and Bedrock (Dail) 1,680 Sq. Ft. <br />Total Area Excavated To Date S . Ft. <br />88,452 <br />Excavator Type _ <br />Komatsu PC800 <br />Fresh Slurry Made Yes <br />FIELD REPRESENTATIVE'S ACTIVITIES: <br />Quality Control Number of <br />Samples Location or Batch # Comments <br />Bentonite Slurry - As-Mixed 1 56+60 Met Spec <br />Bentonite Slurry - In Trench 2 56+80,56+90 Met Spec, Sand Content of 18%, 17% <br />Backfill (Slump, Density) 2 53+70, 54+00 Met Spec <br />Backfill (Gradation) 1 53+70 49% 4200 <br />Backfill (Permeability) -- -- Next permeability sample to be taken around <br />STA 60+00. <br />Verified Clean AM Backfill <br />Slope and Bottom of Key Yes 53+50 through 55+90 Trench cleaned to bottom of key prior to next <br />excavation set. <br />Verified Depth To Bedrock <br />and Key Yes 56+40 through 56+90 Flat bottom (27-28ft) <br />1. Performed quality control testing on slurry and backfill. Observed backfill and excavation operations. Other tests <br />performed yielded results in general accordance with project specifications. Test results were reported to Al of <br />Compass. Prepared Daily Field Report and updated slurry wall data spreadsheet. <br />ATTACHMENTS: None <br />Field Representative(s) Time on/off site Total <br />Benny Siljenberg 0700/1745 12.5 <br />Distribution: Jeff Salsas; file <br />C:\107021-001 Ready Mix\107021-000 Loveland Ready Mix Slurry Wall\C. Lyman Henn Inc. <br />Construction\C.4 Field Reports\Daily Reports\DFR's\DFR 080425.doc
The URL can be used to link to this page
Your browser does not support the video tag.