Laserfiche WebLink
Page 1 of 4 <br />TABLE V <br />SOIL-BACKFILL FIELD TEST RESULTS <br />LOVELAND READY MIX SLURRY WALL <br />LARIMER COUNTY, COLORADO <br /> <br /> <br />Date Sampled <br /> <br />Sample number Top of <br />Backfill Slope <br />Location <br /> <br />Slump (inches) <br /> <br />Unit Weight (pcf) <br />Specification 4< Slump < 6 NA <br />1 18-Dec-07 SB -1 NA 5.00 106.8 <br />2 19-Dec-07 SB -2 NA 5.00 110.8 <br />3 19-Dec-07 SB -3 NA 7.00 109.6 <br />4 20-Dec-07 SB -4 NA 7.00 111.6 <br />5 20-Dec-07 SB -5 NA 6.50 108.0 <br />6 21-Dec-07 SB -6 No backfill mixed on t his day <br />7 3-Jan-08 SB -7 30+00 6.00 109.6 <br />8 4-Jan-08 SB -8 30+10 5.50 116.4 <br />9 4-Jan-08 SB -9 30+25 6.00 115.2 <br />10 5-Jan-08 SB -10 30+60 5.50 112.0 <br />11 5-Jan-08 SB -11 30+90 6.00 113.4 <br />12 6-Jan-08 SB -12 31+20 5.00 119.2 <br />13 6-Jan-08 SB -13 31+40 5.50 113.2 <br />14 7-Jan-08 SB-14 32+40 5.50 112.0 <br />15 7-Jan-08 SB-15 32+60 7.00 117.6 <br />16 8-Jan-08 SB-16 32+70 6.00 113.6 <br />17 8-Jan-08 SB-17 32+80 6.50 120.4 <br />18 9-Jan-08 SB-18 33+20 7.00 113.2 <br />19 9-Jan-08 SB-19 33+40 7.00 116.4 <br />20 10-Jan-08 SB-20 33+60 7.00 116.0 <br />21 10-Jan-08 SB-21 34+80 7.00 113.4 <br />22 11-Jan-08 SB-22 35+80 5.50 116.0 <br />23 11-Jan-08 SB-23 36+80 4.50 114.0 <br />24 3-Apr-08 SB-24 36+50 6.00 120.0 <br />25 4-Apr-08 SB-25 36+50 4.50 116.8 <br />26 5-Apr-08 SB-26 36+50 6.00 118.0 <br />27 7-Apr-08 SB-27 36+50 5.00 114.0 <br />28 7-Apr-08 SB-28 36+50 4.00 114.8 <br />29 8-Apr-08 SB-29 36+50 5.00 116.4 <br />30 9-Apr-08 SB-30 37+00 6.00 117.6 <br />31 9-Apr-08 SB-31 37+20 4.50 115.6 <br />32 11-Apr-08 SB-32 38+00 6.50 119.6 <br />33 11-Apr-08 SB-33 38+50 6.50 120.0 <br />34 12-Apr-08 SB-34 39+00 6.00 114.8 <br />35 12-Apr-08 SB-35 39+60 5.00 117.2 <br />36 13-Apr-08 SB-36 40+00 5.00 116.8 <br />37 14-Apr-08 SB-37 40+10 4.50 117.8 <br />38 14-Apr-08 SB-38 _ <br />40+20 5.50 113.2 <br />39 15-Apr-08 SB-39 41+60 6.00 120.0 <br />40 15-Apr-08 SB-40 42+40 4.00 120.0 <br />41 16-Apr-08 SB-41 43+20 4.00 116.0 <br />42 16-Apr-08 SB-42 44+00 4.50 116.8 <br />43 17-Apr-08 SB-43 44+50 4.50 114.8