Laserfiche WebLink
Page 2 of 2 <br />TABLE IV <br />SOIL TEST RESULTS - BACKFILL MIX <br />LOVELAND READY MIX SLURRY WALL <br />I ARIKAGR rnl IIVTV rCll r)PAnr) <br /> <br /> <br /> <br />ackfill <br />Sample ID <br /> <br /> <br /> <br />ate Sampled <br /> <br /> <br />op of Backfill Slope <br />Location Percent Soil <br />Material Passing <br />the #200 Sieve for <br />material less than <br />3/8-in <br /> <br /> <br />oisture <br />Content <br /> Specificati on > 30 <br />40 SB-69 7-May-08 61+80 38 34 <br />41 SB-71 8-May-08 63+40 37 29 <br />42 SB-73 9-May-08 65+20 37 26 <br />43 SB-75 10-May-08 67+30 41 27 <br />44 SB-77 11-May-08 68+50 38 27 <br />45 SB-79 12-May-08 69+50 34 28 <br />46 SB-81 14-May-08 71+10 34 32 <br />47 SB-83 15-May-08 72+50 35 30 <br />48 SB-85 16-May-08 00+30 36 26 <br />49 SB-87 17-May-08 1+30 30 29 <br />50 SB-88 18-May-08 2+30 36 28 <br />51 SB-89 19-May-08 3+00 30 29 <br />52 SB-91 20-May-08 4+60 31 34 <br />53 SB-93 21-May-08 7+30 36 31 <br />54 SB-95 28-May-08 8+80 34 27 <br />55 SB-97 29-May-08 9+90 48 28 <br />56 SB-99 30-May-08 11+20 59 32 <br />57 S13-1 01 31-May-08 13+80 38 33 <br />58 SB-103 2-Jun-08 14+30 41 26 <br />59 SB-105 3-Jun-08 15+30 44 28 <br />60 SB-107 4-Jun-08 16+50 36 32 <br />61 SB-109 6-Jun-08 17+80 38 28 <br />62 S13-1 10 7-Jun-08 18+60 55 38 <br />63 S13-1 12 8-Jun-08 19+70 60 30 <br />64 S13-1 14 9-Jun-08 20+20 47 30 <br />65 S13-1 16 10-Jun-08 20+90 45 27 <br />66 S13-1 18 11-Jun-08 21+60 46 30 <br />67 S13-1 19 12-Jun-08 21+90 38 28 <br />68 SB-121 13-Jun-08 22+30 34 36 <br />69 SB-122 18-Jun-08 22+80 35 30 <br />70 S13-1 24 19-Jun-08 23+50 37 31 <br />71 S13-1 26 20-Jun-08 24+50 36 28 <br />72 S13-1 28 21-Jun-08 25+00 33 38 <br />73 S13-1 30 22-Jun-08 25+70 35 27 <br />74 SB-131 23-Jun-08 25+80 32 28 <br />75 S13-1 32 24-Jun-08 26+30 33 29 <br />76 S13-11 34 25-Jun-08 27+10 33 30 <br />77 S13-1 36 26-Jun-08 27+70 37 26 <br />78 S13-1 38 27-Jun-08 29+00 35 28 <br />LYMAN HLNN INU. 8/27/2008 <br />G:\PROJECTS\107021-000 Loveland Ready Mix Slurry Wall\C. Construction\C.4 Field Reports\[quality <br />control worksheets to match compass.xls]Report Table-Backfill Gradation