Laserfiche WebLink
COST SUMMARY WORK <br />Task description: <br />Site: Corey Gravel Pit #3 Permit Action: 2011 Review <br />PROJECT IDENTIFICATION <br />Task #: OOB State: Colorado <br />Date: 5/17/2011 County: Montrose <br />User: GRM <br />Agency or organization name: DRMS <br />TASK LIST (DIRECT COSTS) <br /> <br />Task <br /> <br />Description Form <br /> <br />Used Fleet <br /> <br />Size Task <br /> <br />Hours <br /> <br />Cost <br />Ola cut and fill DOZER 1 35.11 $7,312.63 <br />02a rip 10 acres of pit floor GRADER 1 5.13 $764.00 <br />03a replace 12" of overburden on12 acres SCRAPERI 1 18.56 $10,535.90 <br />04a replace 12" topsoil SCRAPERI 1 15.68 $8,902.07 <br />05a final grading GRADER 1 6.16 $880.00 <br />06a reve etation 20 acres total disturbance REVEGE 1 40.00 $16,531.78 <br />07a initial mobilization MOBILIZE 1 2.22 $4,462.54 <br />SUBTOTALS: 122.86 $ $49,388.92 <br />INDIRECT COSTS <br />OVERHEAD AND PROFIT: <br />Liability insurance: 2.02 <br />Performance bond: 1.05 <br />Job superintendent: 61.43 <br />Profit: 10.00 <br />Permit/Job#: M1987024 <br />Abbreviation: None <br />Filename: M024-00b <br />Total = <br />Total = <br />Total = <br />Total = <br />TOTAL O&P= <br />CONTRACT AMOUNT (direct + O & P) = <br />LEGAL - ENGINEERING - PROJECT MANAGEMENT: <br />Financial warranty processing (legal/related costs): 0.00 <br />Engineering work and/or contract/bid preparation: 0.00 <br />Reclamation management and/or administration: 5.00 $2,972.07 <br />CONTINGENCY: 3.00 Total= $1,481.67 <br />TOTAL INDIRECT COST = $14,506.21 <br />TOTAL BOND AMOUNT (direct + indirect) = $63,895.13 <br />$997.66 <br />$518.58 <br />$3,597.34 <br />$4,938.89 <br />$10,052.47 <br />$59,441.39 <br />Total = 0.00 <br />Total = $0.00