Laserfiche WebLink
Greg Lewicki And Associates, PLLC <br />11541 Warrington Court Phone: (303) 346-5196 Fax (303)-346-6934 <br />Parker, CO USA 80138 E-Mail: info@lewicki.biz <br />May 20, 2011 <br />Marcia Talvitie <br />Sandy Brown <br />Colorado Division of Reclamation, Mining, and Safety <br />1313 Sherman St, Rm 215 MAY 23) 2011 <br />Denver, CO 80203 Division or Redamaiian, <br />Mining and Safety <br />RE: SL-12 Adequacy Review 04 (AR-04) Response <br />Based on the items detailed in the AR-04 letter from DRMS on May 5, 2011, a meeting on May 13, 2011, and <br />the follow-up letter dated May 16, 2011, Western Fuels-Colorado (WFC) has made several changes to the bond <br />release application SL-12. Explanation of the changes, including background reasoning, is discussed below. <br />Attached to this letter is the updated bond release application, along with it's appendices and maps. <br />The following is a brief summary of the adequacy items remaining from AR-04 and responses to each item. <br />Item #1.' <br />DRMS: Please restore the Aug. 31, 2009 letters to Appendix A and remove those dated Aug. 18, 2009. Please <br />provide a summary table for Appendix A which lists the contact information for each person and/or entity that <br />received notice of the SL-12 bond release application, differentiating between landowners, adjoining <br />landowners, and others. <br />We have changed out the letters as requested by the Division, and Appendix A now has a table at the beginning <br />outlining all of the notification letters in the organized fashion requested by DRMS. <br />Item #5 <br />Please revise the Phase 2 Area I topsoil information on pages 9 and 10 of the application text to refer to 2007 <br />rather than 2006, and incorporate the 2007 area into Map R-1. <br />The Phase 2 portion of bond release has been removed from the revised SL-12 application, therefore this item is <br />no longer relevant. <br />Item #6 <br />Please review the information provided herein, together with any changes made to topsoil replacement <br />requirements for the remainder of the permit area. Please provide a clear and thorough justification for the <br />numerous alterations that have been made to Map 2.05.4-4, including discussion of the actual replacement <br />thicknesses measured. <br />It has been determined that Map 2.05.4-4 was erroneously altered as part of work on TR-57 and PR-06. During <br />discussions with DRMS at the May 16, 2011 meeting, it was agreed that WFC would revert the areas on Map <br />•f