My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-05-23_REVISION - C1981019 (2)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981019
>
2011-05-23_REVISION - C1981019 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:33:45 PM
Creation date
5/23/2011 2:53:26 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
REVISION
Doc Date
5/23/2011
Doc Name
2nd Adequacy Response Review
From
Colowyo Coal Company
To
DRMS
Type & Sequence
PR3
Email Name
JHB
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Colowyo Response - PR3 adequacy No. 2 10 May 6, 2011 <br />The Division acknowledges that a revised mine plan will be submitted by CCC during this PR3 <br />review. The Division may then have new adequacy review questions after reviewing the new mine <br />plan that have not been raised herein. <br />1. Please include elevation values on the pre-mining topography map, Map 1813. <br />The response was adequate. Elevations were added to contours on Map 18B and numerous <br />other maps. <br />2. Revised Mine plan Map 28B shows the proposed dimensions of the Little Collum X pit. This <br />map does not show haul roads into or out of Little Collum X pit, nor are any ramps depicted. <br />How will Colowyo access the pit? Please show haul roads and ramps into Little Collum X pit. <br />Haul roads are shown for Collum Lite Pit, but no ramps are shown. Please add placement of <br />Ramp locations Collum Lite Pit. <br />Colowyo's Response: <br />The Little Collom Xpit shown on Map 23B and other related drawings is very shallow. The <br />target X seam essentially outcrops in the area and there is very little overburden above the <br />coal. Along the pit perimeter, overburden depths increase to about 100 feet. Because the Little <br />Collom X pit floor is the base of the X seam coal, no ramps are required. <br />For the Collom Lite pit, the ramps into the pit are expected to change frequently during the <br />10 initial boxcut development. In pit ramps are of uniform slope of 10% or less. It is expected <br />that the Central Haul Road will be the primary haulage route during initial development, with <br />the East and West Haul Roads used more during the later stages of boxcut excavation and <br />during subsequent mining. Map 25D been modified to show the proposed ramp during initial <br />boxcut development. <br />Rule 2.05.3(3)(c) Mine Facilities-Roads and 4.03 Haul Roads and Access Roads <br />CCC's responses to adequacy Items 2.05.3(3)(c); 1, 2, 3, and 4 are currently being evaluated by the <br />Division. If additional questions remain regarding this section, the Division will send a third adequacy <br />letter under separate cover with regards to these items. <br />Colowyo's Response: <br />As of this submittal date, Colowyo has not received any comments regarding our response to <br />adequacy items 2.05.3(3)(c) 1, 2, 3, and 4. <br />Rule 2.05.3(4) Ponds, Impoundments, and Diversions <br />The application includes a plan to use an in-pit sump in combination with a large sediment pond <br />located below all mining within Collom Gulch. Geotechnical analyses for the pond were included <br />with the application. In general, the Division finds the plan adequate. However, based on recent <br />information regarding changes to the mine plan in the northern portion of the proposed permit area <br />due to Federal coal lease issues, runoff and sediment modeling will need to be rerun for the
The URL can be used to link to this page
Your browser does not support the video tag.