My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-07-24_GENERAL DOCUMENTS - M2009076 (2)
DRMS
>
Day Forward
>
General Documents
>
Minerals
>
M2009076
>
2009-07-24_GENERAL DOCUMENTS - M2009076 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:49:04 PM
Creation date
5/23/2011 8:23:03 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2009076
IBM Index Class Name
GENERAL DOCUMENTS
Doc Date
7/24/2009
Doc Name
Declaratory Order Info.
From
Venture Resources
To
DRMS
Permit Index Doc Type
Gen. Correspondence
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
71
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Erosion Control Plan showing construction details and revegetation plans <br />Location of any buildings or structures on the property where the proposed <br />work will be done <br />Location of any buildings or structures on land of adjacent property owners that <br />are within 15ft of the property or that may be affected by the proposed <br />excavation <br />Once you have all the required documentation, you will need to submit your plans and documents to <br />the Site Development Inspector for review. <br />The plan review fees are as follows and will be included in the total permit fee collected prior to the <br />Site inspection. <br />50 cubic yards (38.2m3) or less .......................................... No fee <br />51 to 100 cubic yards (40 m3to 76.5m3 ................................... $23.50 <br />101 to 1,000 cubic yards (77.2 m3to 764.6 m3) ............................. $37.00 <br />1,001 to 10,000 cubic yards (765.3 m3 to 7645.5 m3 .........................$49.25 <br />10,001 to 100,000 cubic yards (7646.3 m3 to 76,455 m3-$49.25 for the first 10,000 cubic <br />yards (7645.5 m3), plus $24.50 for each additional 10,000 yards (7645.5 m3) or <br />fraction thereof. <br />100,001 to 200,000 cubic yards (76,456 m3 to 152,911 m3)-$269.75 for the first 100,000 <br />cubic yards (76,455 m3), plus $13.25 for each additional 10,000 cubic yards <br />(7645.5 m3) or fraction thereof. <br />200,001 cubic yards (152,912 m 3) or more-$402.25 for the first 200,000 cubic yards <br />(152,911 m3), plus $7.25 for each additional 10,000 cubic yards (7645.5 m3) or <br />fraction thereof. <br />Other Fees: <br />Additional plan review required by changes, additions, or revisions to approved plans <br />(minimum charge-one-half hour) ................................ $50.50 per hour <br />The table outlining the fee schedule for the permit is as follows: <br />50 cubic yards (38.2 m3) or less ....................................... $23.50 <br />51 to 100 cubic yards (40 m3 to 76.5 m3) ................................ $37.00 <br />101 to 1,000 cubic yards (77.2 m3 to 764.6m3)- $37.00 for the first 100 cubic yards <br />(76.5 m3) plus $17.50 for each additional 100 cubic yards (76.5 m3) or fraction <br />thereof. <br />1,001 to 10,000 cubic yards (765.3 m3 to 7645.5 m3)-$194.50 for the first 1,000 cubic yards <br />(764.6 m3), plus $14.50 for each additional 1,000 cubic yards (764.6 m3), or fraction <br />thereof. <br />10,001 to 100,000 cubic yards (7646.3 m3 to 76,455 m3)-$325.00 for the first 10,000 <br />cubic yards (7645.5 m3), plus $66.00 for each additional 10,000 cubic yards <br />(7645.5 m3) or fraction thereof. <br />100,001 cubic yards (76,456 m3) or more-$919.00 for the first 100,000 cubic yards <br />(76,455 m3), plus $36.50 for each additional 10,000 cubic yards (7645.5 m3) or <br />fraction thereof. <br />
The URL can be used to link to this page
Your browser does not support the video tag.