Laserfiche WebLink
4 <br />reprocessed seismic line 474 to intersect a region of flat dipping stratigraphy. The <br />proposed drill hole will be located adjacent to the existing road and will not block <br />existing access. Site access will require no new road construction. <br />4. Site RMP-4 is located along an existing 4WD road in SW1/4 sec 33, T43N R18W, <br />NAD27 zone 12 UTM 688000E 4201430N, Joe Davis Hill 7.5 minute quad, San Miguel <br />County, Colorado, on prospecting permit COC73574. The proposed drill site was <br />positioned at station point 700 on reprocessed seismic line124-82 to intersect a region of <br />flat dipping stratigraphy and is located about 500 feet west of the Dolores Canyon rim, a <br />distance that will provide sufficient sight and sound buffer to recreation users in the <br />Canyon. Site may require the improvement of about 3500 feet of existing 4WD road. <br />5. Site RMP-5 is near existing roads in SEl/4 sec 10 T42N R18W, NAD27 zone 12 <br />UTM 690300E 4198520N, Joe Davis Hill 7.5 minute quad., San Miguel County, <br />Colorado, on prospecting permit COC73598. The proposed drill site was positioned <br />based on a detailed seismic interpretation to intersect a region of flat dipping stratigraphy <br />and is about 500 feet from the Dolores Canyon rim, a distance that will provide sufficient <br />sight and sound buffer to recreation uses in the Canyon. Site may require of about 200 <br />feet of new access road. <br />6. Site RMP-6 is located in SWl/4 sec 29 T42N R18W, NAD27 zone 12 UTM 686192E <br />4193386N Dove Creek 7.5 minute quad, Dolores County, Colorado, on prospecting <br />permit COC774370. The drill site was positioned based on a detailed seismic <br />interpretation to intersect a region of flat dipping stratigraphy and is accessible by about 1 <br />mile of existing 4WD road extending from extending from Sand Rock Road; <br />improvements to these existing dirt 4WD road may be necessary. <br />Attachments to 1211. Maps and Drawings <br />RM Potash, Colorado Potash project, Exploration Plan Map 2. <br />RM Potash Exploration Plan Map 3, proposed drill hole sites on Egnar 7.5 minute USGS <br />quadrangle. <br />RM Potash Exploration Plan Map 4, proposed drill hole sites on Joe Davis Hill 7.5 <br />minute USGS quadrangle. <br />RM Potash Exploration Plan Map 5, drill hole site on Dove Creek 7.5 minute USGS <br />quadrangle.