Laserfiche WebLink
of Coco COLORADO DIVISION OF RECLAMATION, MINING AND SAFETY <br />yew $ MINERALS PROGRAM INSPECTION REPORT <br />PHONE: (303) 866-3567 <br />* 1876 <br />The Division of Reclamation, Mining and Safety has conducted an inspection of the mining operation <br />noted below. This report documents observations concerning compliance with the terms of the permit <br />and applicable rules and regulations of the Mined Land Reclamation Board. <br />MINE NAME: <br />Dee a Farm Pit MINE/PROSPECTING ID#: <br />M-1981-302 MINERAL: <br />Sand and gravel COUNTY: <br />Boulder <br />INSPECTION TYPE: JNSPECTOR(S): INSP. DATE: INSP. TIME: <br />Monitoring 44ichael A. Cunningham Aril 26, 2011 14:45 <br />OPERATOR: OPERATOR REPRESENTATIVE: TYPE OF OPERATION: <br />The Regents of the University of Colorado Jeff Lipton, Jonathan Akins, 112c - Construction Regular Operation <br /> Dave Laliberte <br />REASON FOR INSPECTION: BOND CALCULATION TYPE: BOND AMOUNT: <br />Normal I&E Program None $0.00 <br />DATE OF COMPLAINT: POST INSP. CONTACTS: JOINT INSP. AGENCY: <br />NA None None <br />WEATHER: INSP TO 'S SI NATURE: SIGNATURE DATE: <br />Raining <br /> <br />The followine inspection tonics were identified as havine Problems or Possible Violations. OPERATORS <br />SHOULD READ THE FOLLOWING PAGES CAREFULLY IN ORDER TO ASSURE COMPLIANCE <br />WITH THE TERMS OF THE PERMIT AND APPLICABLE RULES AND REGULATIONS. If a <br />Possible Violation is indicated, you will be notified under separate cover as to when the Mined Land <br />Reclamation Board will consider possible enforcement action. <br />INSPECTION TOPIC: Hydrologic Balance <br />PROBLEM/POSSIBLE VIOLATION: Problem: Failure to follow approved reclamation plan, or current reclamation <br />plan needs to be updated and clarified pursuant to C.R.S. 34-32.5-116 (1). The operator must follow approved <br />reclamation plan or provide sufficient information to describe or identify how the operator intends to conduct <br />reclamation. <br />CORRECTIVE ACTIONS: The operator shall submit a Technical Revision, with the required $216 revision fee, to <br />update and clarify the current approved reclamation plan to reflect existing and proposed activities by the <br />corrective action date. <br />CORRECTIVE ACTION DUE DATE: 6/17/11 <br />INSPECTION TOPIC: Reclamation Success <br />PROBLEM/POSSIBLE VIOLATION: Problem: Mining at the Deepe Farm Pit has been complete for over five years <br />and the Operator has failed to complete reclamation. Rule 3.1.3 states that all reclamation shall be carried to <br />completion within five years from the date the Operator informs the Division that mining is complete. <br />CORRECTIVE ACTIONS: The Operator shall complete reclamation of the site in accordance with the approved <br />Reclamation Plan by the corrective action date. The Operator shall notify the Division upon completion of <br />reclamation and shall request an inspection of the site. <br />CORRECTIVE ACTION DUE DATE: 4/12/12 <br />Page 1 of 5