6.44(b) <br />Revised 1/27/2011 <br />DRMS Quest # 7 & 8 <br />a commitment to a QA/QC acceptable to the Division is also provided in Exhibit E. <br />• Some portions of the proposed reservoir expansion area will need to be <br />disturbed in order to construct the slurry wall prior to beginning mining. These <br />areas include access roads, work area, slurry wall trench line work area, <br />equipment and supplies storage area, access to overburden suitable for slurry wall <br />construction, and portions of the proposed overburden and topsoil stockpiles. <br />Not all excavated slurry wall trench overburden may be suitable for slurry wall <br />construction. Therefore, an onsite source, within the proposed pit area, may be <br />needed to be available. <br />• Water pipelines: <br />Pipeline interconnects will be constructed (AFTER MINING) as part of the <br />developed water resource reclamation plan. The pipelines will include,. but be <br />limited to, a 36 inch valved connection from existing Goose Haven No. 1 to <br />proposed Goose Haven No. 2 as well as a 36 inch valved connection from <br />existing Goose Haven No. 3 to proposed Goose Haven No. 2. (THE <br />INTERCONNECTS WILL CONFORM TO SEO STANDARDS.) <br />The buried pipelines will be installed in excavated trenches with appropriate <br />bedding materials, obtained from the sand and gravel extraction operation. <br />Trenches and placement of the ductile iron 36"diameter waterlines will be <br />accomplished using equipment suitable for such construction, such as long reach <br />backhoes, draglines, dozers, frontend loaders and motor-graders. Upon <br />completion of pipeline installation, all associated affected lands will be reclaimed <br />according to the approved reclamation plan. <br />• Subsurface Drain: <br />Based on the ground water investigation conducted by CTL Thompson <br />(Attachment III), an under drain will be constructed (Attachment II) along the <br />south side of the proposed reservoir AT THE TIME THE SLURRY WALL IS <br />CONSTRUCTED to reduce the ground water rise resulting from the construction of <br />Reservoir #2. The drain will free flow and empty into Reservoir #1 to the north. <br />The drain will effectively prevent any significant rise in the ground water <br />elevation in areas to the south and south west of the proposed expansion. <br />(c) Water diversions and impoundment: <br />There are no water diversions or impoundments affected by the proposed mining and <br />reclamation plan. . <br />