Equity Exploration Project <br />6-2.2 Project Scope <br />PHASEI <br />Phase I will include rehabilitating and stabilizing the Equity Mine portal to allow access to the <br />main decline and reopening and stabilizing the ventilation drift. The purpose of this first phase <br />of work is to provide safe access for Hecla personnel: to check the water level in the <br />underground development and evaluate the condition of the workings between the Equity <br />portal, the ventilation adit and back to the borehole. Reopening of the Equity Mine portal is <br />scheduled to start in mid to late June 2011, depending on weather conditions and the ability to <br />obtain permits to conduct Phase I activities which are listed below. <br />• Remove rock talus cover and plug fill from portal entrance. The plug is expected to be from <br />surface and continue to approximately 50 feet into the portal entrance. <br />• Remove rock talus fill from ventilation drift and rehabilitate, as necessary, the supporting <br />steel set structure. <br />• Rehabilitate main portal and ventilation opening, steel set structure and continuing <br />approximately 200 feet from the Equity portal and ventilation adit entrances. Refer to <br />attached Figure 4 - Phase I. <br />• Install a steel gate at portal entrance and on the ventilation drift access, with backward- <br />facing hinges and a "reach-under" box welded to the door to protect the security lock. <br />• Re-establish services as required to perform rehabilitation work. <br />PHASE II <br />The scope of the Phase II work will be dependent on the evaluation of the underground development <br />after the completion of Phase I. <br />Phase II will include rehabilitation of the remaining drift after Phase I between the Equity portal, <br />ventilation adit and bore hole. Establish ventilation and rehabilitate the main decline and ventilation <br />