My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-05-12_PERMIT FILE - P2011010 (2)
DRMS
>
Day Forward
>
Permit File
>
Prospect
>
P2011010
>
2011-05-12_PERMIT FILE - P2011010 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:33:28 PM
Creation date
5/16/2011 3:10:37 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
P2011010
IBM Index Class Name
PERMIT FILE
Doc Date
5/12/2011
Doc Name
New NOI application (public file)
From
Rio Grande Silver, Inc.
To
DRMS
Email Name
RCO
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Equity Exploration Project <br />6-2.2 Project Scope <br />PHASEI <br />Phase I will include rehabilitating and stabilizing the Equity Mine portal to allow access to the <br />main decline and reopening and stabilizing the ventilation drift. The purpose of this first phase <br />of work is to provide safe access for Hecla personnel: to check the water level in the <br />underground development and evaluate the condition of the workings between the Equity <br />portal, the ventilation adit and back to the borehole. Reopening of the Equity Mine portal is <br />scheduled to start in mid to late June 2011, depending on weather conditions and the ability to <br />obtain permits to conduct Phase I activities which are listed below. <br />• Remove rock talus cover and plug fill from portal entrance. The plug is expected to be from <br />surface and continue to approximately 50 feet into the portal entrance. <br />• Remove rock talus fill from ventilation drift and rehabilitate, as necessary, the supporting <br />steel set structure. <br />• Rehabilitate main portal and ventilation opening, steel set structure and continuing <br />approximately 200 feet from the Equity portal and ventilation adit entrances. Refer to <br />attached Figure 4 - Phase I. <br />• Install a steel gate at portal entrance and on the ventilation drift access, with backward- <br />facing hinges and a "reach-under" box welded to the door to protect the security lock. <br />• Re-establish services as required to perform rehabilitation work. <br />PHASE II <br />The scope of the Phase II work will be dependent on the evaluation of the underground development <br />after the completion of Phase I. <br />Phase II will include rehabilitation of the remaining drift after Phase I between the Equity portal, <br />ventilation adit and bore hole. Establish ventilation and rehabilitate the main decline and ventilation <br />
The URL can be used to link to this page
Your browser does not support the video tag.