Laserfiche WebLink
e. Re-vegetation of completed mining areas and natural earth wind barriers that are <br />to remain for the duration of the project. Alternatively, berms that are temporary <br />may be mulched <br />f. Water or Magnesium Chloride will be used on roadways and parking areas <br />g. Open areas of the pit that where vegetation has been removed shall be sprayed <br />with tackifier or covered with erosion control blankets <br />h. Gravelling of all haul roads, access roads, and equipment storage yards <br />i. Vehicular speeds to remain under 25 mph onsite <br />j. Watering of anticipated disturbed sites prior to work in that area. <br />k. Operations shall cease during wind events exceeding 30 mph <br />1. Haul trucks will be covered with a tarp or other suitable cover <br />m.Water or dust suppressants will be applied to storage piles and any other <br />disturbed surface areas <br />n. Other techniques shall be employed as necessary. (LPLUC 82-192, 82-193) <br />VI. Other Business: <br />VII. Adjournment <br />Commissioner Hotter called the meeting adjourned. <br />ATTEST: <br />BOARD OF COUNTY COMMISSIONERS <br />LA PLATA COUNTY, COLORADO <br />Jeanne Bignall, Kellie C. Hotter, Chair <br />Clerk to the Board <br />(SEAL) <br />Robert A. Lieb, Jr., Vice-Chair <br />Wallace White, Commissioner <br />Lill <br />T.Rcr,PA-TOVE-1, C, CO La Plata Board of County Commissioners Page 16 3/1/2011 ' <br />`MAS G AGt eR- G94LJEL- <br />O rr M - tPA6C- M - 35