Laserfiche WebLink
UA - Onshore Gas Number: CO-HSE-032 <br /> HSE Procedure Custodian: Colorado Operations <br /> Spill Prevention, Control and Revision: 0 <br /> Countermeasure (SPCC) Plan Effective: January 2012 <br />7.2 Spill Response and Clean-up Plan <br />• Protect yourself. <br />Personal protective equipment shall be worn by all personnel in the spill area. Use testing <br />and sampling equipment to determine potential safety hazards. <br />• Eliminate ignition sources and restrict access to the spill area. <br />e.g., all gasoline/diesel engines (all motor vehicles), smoking, cutting/welding operations, <br />flaming devices and metal-to-metal contacts that could create a spark. <br />• If safe, take immediate steps to shut off the spill source. <br />e.g., close valves, shut offpumps, and/or activate Emergency Shutdown (ESD) stations. <br />• Contain the spill utilizing Facility and/or locally available response <br />equipment and services. <br />Immediate response by site staff may include the use of an East RDD Project spill "kits " to <br />minimize the horizontal and vertical extent of the spill. This may include but is not limited to <br />booms, absorbent materials, tools (rake, shovel). Kits will be located on each drill rig and <br />one at bulk fuel storage tank. <br />Use of the site digging machine (back hoe) to create a berm, diversionary ditch, etc. may be <br />necessary. <br />If deemed necessary, a service contractor will be mobilized to prepare further containment, <br />clean-up, etc., as appropriate, depending on size and location of spill. <br />• Assess the spill. <br />Estimate extent of spill and other information necessary for notification. <br />Section 4 - Spill Notification and Reporting Procedure provides guidance. <br />• Notify the Supervisor. <br />Describe the spill and any actions taken that may affect Facility operations. Internal and <br />External notifications will be made by designated personnel. <br />• Clean-up the spill, as necessary. <br />Action taken by Shell personnel to contact East RDD Project's earth moving contractor. <br />• Revise process/procedures to reduce recurrence. <br />Remember, N? ithout exeeptton;,PER L'tS.a` [ T.l 1S.FIRST, ,PRIURITti : ? rce'?sn e . w <br />' oduct tihc?uld_he,a?oidecl 1 y K , <br />c-p?,s.ut.e to--the NaPo? and l?yu,?cls t4?ec o th?a5t? l cd <br />Ly, <br />Printed: April 7, 2011 Section 7 Page 30 of 71 <br />The controlled version of this "controlling document" resides online in Livelink®. Printed copies are UNCONTROLLED.