Laserfiche WebLink
April 27, 2011 C-1981-014/Southfield Mine JHB <br /> ROADS—Rule 4.03❑❑Construction 4.03.l(3)/4.03.2(3)❑❑Drainage 4.03.1(4)/4.03.2(4)❑[]Surfacing and <br /> Maintenance4.03.1(5)and(6)/4.03.2(5)and(6)❑❑Reclamation 4.03.1(7)/4.03.2(7): <br /> The access road through the reclaimed facilities area, and to the refuse area appears to be in good <br /> condition and well graded. No erosion gullies on the roadway or ponded areas on the road were observed. <br /> RECLAMATION SUCCESS -Rule 4.15,Rule 3: <br /> No problems were noted in the aerial photos. The remaining structures at the load out,and reclaimed vent <br /> fan were not included in these photos. <br /> REVEGETATION—Rule 4.15❑❑Vegetative Cover;Timing: <br /> The vegetation is just beginning to green up for the 2011 growing season. The vegetation still looks <br /> brown, with just the beginning of greening up. <br /> SUPPORT FACILITIES -Rule 4.04: <br /> A dozer and motor-grader remain on site for maintenance. The recalimed tunnel appears unchanged. No <br /> problems were noted with the remaining structures. <br /> DOCUMENTS RECEIVED <br /> OTHER(SPECIFY) <br /> Number of Partial Inspection this Fiscal Year: 7 <br /> Number of Complete Inspections this Fiscal Year: 3 <br /> Page 3 of 6 <br />