Laserfiche WebLink
<br />amec'? <br />AMEC observed and inventoried geomembrane delivered to site. <br />Testing Summary <br />Laboratory testing continued (Particle Size Distribution, Atterberg Limits, Moisture-Density Relations, <br />Specific Gravity, Permeability, and Point Load testing) for sampled materials. <br />GENERAL PROJECT ITEMS <br />Summary of Concerns: <br />No concerns <br />Summary of Planning Items: <br />Continue slope contouring within the Phase 5 VLF. <br />Continue receiving geomembrane to site. <br />Summary of Non-conformances: <br />None Issued <br />Summary of Meetings and Discussions: <br />CC& V.• <br />CC&V held a Pre-construction meeting on April 19, 2011. Items discussed included Safety, <br />Environmental, Schedule, QC documentation, and CQA. <br />Ames Construction: <br />None <br />AMEC: <br />John Lupo (AMEC) and Jay Moore (AMEC) were onsite to observe and discuss project activities, <br />schedule, and progress. <br />Other: <br />None <br />Summary of Incidents/Accidents/Health & Safety Issues: <br />None <br />We trust the information provided clearly represents our findings and observations for the week ending <br />April 23, 2011. <br />Joseph D. Hick , QA <br />Approved By: <br />: April 23, 2011 <br />;? ? NP I I <br />VLF Weekly Report WE 04.23.2011